100-108 East 64 Street, Manhattan • Block 01398 • Lot 0072
14 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jul 31, 2025 | 140676971 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $0 | CENTRAL PRESBYTERIAN CHURCH |
| Jul 31, 2025 | 140676917 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED, 600PSF FOR MATERIAL STORAGE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $0 | CENTRAL PRESBYTERIAN CHURCH |
| Feb 6, 2025 | 123903954 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | — | $1,600,000 | CENTRAL PRESBYTERIAN CHURCH |
| May 21, 2024 | 121228947 | Alteration Type II | SIGNED OFF | EXTERIOR RESTORATION AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION | $532,580 | CENTRAL PRESBYTERIAN CHURCH |
| May 21, 2024 | 121238071 | Alteration Type II | SIGNED OFF | LIMESTONE TOWER RECONSTRUCTION AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION | $2,154,675 | CENTRAL PRESBYTERIAN CHURCH |
| May 20, 2024 | 123903927 | Alteration Type II | SIGNED OFF | SPRINKLER WORK ON THE SC, CELLAR, MEZZANINE AND 1ST FLOOR AS INDICATED ON DRAWINGS. | $300,000 | CENTRAL PRESBYTERIAN CHURCH |
| Sep 27, 2019 | 123903945 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | REMOVE AND RELOCATE HORIZONTAL STANDPIPE FEED MAIN CONTROL VALVE IN ROOF TO 3RD FLOOR CEILING. | $300,000 | CENTRAL PRESBYTERIAN CHURCH |
| Nov 16, 2017 | 104408678 | Alteration Type III | SIGNED OFF | INSTALLATION OF HEAVY DUTY SIDEWALK SHED 183' DURING FACADE REPAIR. NO CHANGE IN USE. EGRESS OR OCCUPANCY. SHED TO CO... | $0 | CENTRAL PRESPETRIAN CHURCH |
| Aug 22, 2017 | 140676999 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED INSTALLATION OF MATERIAL HOIST WITH IN PIPE SCAFFOLDING FRAMES, NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $0 | CENTRAL PRESBYTERIAN CHURCH |
| Jul 27, 2017 | 140674278 | Alteration Type III | PLAN EXAM - IN PROCESS | PROPOSED INSTALLATION OF MATERIAL HOIST WITH IN PIPE SCAFFOLDING FRAMES, NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $0 | CENTRAL PRESBYTERIAN CHURCH |
| Jul 26, 2017 | 140674063 | Alteration Type III | PLAN EXAM - IN PROCESS | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED, 600PSF FOR MATERIAL STORAGE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $0 | CENTRAL PRESBYTERIAN CHURCH |
| Jul 26, 2017 | 140674116 | Alteration Type III | PLAN EXAM - IN PROCESS | PROPOSED INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $0 | CENTRAL PRESBYTERIAN CHURCH |
| Nov 17, 2016 | 140112955 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | SPRING SCAFFOLDING LLC |
| Jul 11, 2003 | 103496101 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Interior renovation of an existing day school at the 2nd, 3rd, and mezz level. Architectural and plumbing work. There... | $89,000 | Central Presbyterian Church |