Hunter College West Building, Manhattan
Manhattan • Block 01402 • Lot 0013 • Zip: 10065
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 16 min 6 walking, 10 riding
- Union Square 22 min 6 walking, 16 riding
- Times Square 23 min 6 walking, 17 riding
- Fulton Street 29 min 6 walking, 23 riding
- Penn Station 30 min 6 walking, 24 riding
- Downtown Brooklyn 37 min 6 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Lungi
No description yet
Le Veau d'Or
Le Veau d'Or is a charming French bistro in NYC offering classic dishes like coq au vin and escargot. The cozy atmosp...
Cafe Boulud
No description yet
Marcel
No description yet
Chez Fifi
No description yet
Daniel
Daniel is a sophisticated and elegant restaurant located in the heart of New York City. With a focus on French cuisin...
Bemelmans Bar
The Carlyle Hotel's sophisticated, upscale piano bar, adorned with Ludwig Bemelmans' famed murals.
JG Melon
JG Melon is a classic American eatery known for its famous burgers and cozy, old-school atmosphere. Located on the Up...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type II
HEREWITH FILING FOR PLUMBING WORK AS INDICATED ON PLANS.
2025
-
Alteration Type II
HUNTER COLLEGE WEST BUILDING, ROOF REPLACEMENT & REPAIRS AT 8TH FLOOR TERRACE AS PER THE PLANS FILED INCLUDING, R...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
2024
-
Alteration Type II
FILING FOR BUILD-OUT OF STARBUCKS SPACE AND RELATED INTERIOR AND EXTERIOR GENERAL CONSTRUCTION. REMOVAL & INSTALL...
-
DOB violation Feb 22, 2024
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2023
-
Alteration Type II
HEREWITH FILING FOR RELOCATION AND INSTALLATION OF SPRINKLER HEADS
2022
-
Alteration Type II
FILING FOR REPLACEMENT OF FIRE COMMAND STATION AND REMOTE ANNUNCIATORS, AND GRAPHIC ANNUNCIATOR, AS PER BUILDINGS BUL...
2021
-
DOB violation Oct 13, 2021
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
BC3307.2.1 STREET BARRIERS (REFLECTORS)AT TIME OF INSPECTION ON ACTIVE JOBSITE OBSERVED YOCOCK BARRIERS INSTALLED ALO...
-
CLASS - 1
BC 3314.4.3.1 ALL TEMPORARY CONSTRUCTION EQUIPMENT SHALL BE INSPECTED PRIOR TO INSTALLATION.AT TIME OF INSPECTION OBS...
-
CLASS - 1
FAILURE TO MAINTAIN/DISPLAY ON SITE DRAWINGS/DOCUMENTS REQUIRED BY CHAPTER 33.AT TIME OF INSPECTION OBSERVED C-HOOK S...
-
CLASS - 2
FAILURE TO PROVIDE APPROVED PLANS AT SITE. AT TIME OF INSPECTION OBSERVED C-HOOK SUSPENDED SCAFFOLDS INSTALLED AND IN...
-
CLASS - 1
BC3314.10.10 SUPPORT DEVICES (C-HOOKS) AT TIME OF INSPECTION OBSERVED C-HOK SUSPENDED SCAFFOLDS INSTALLED AND IN USE ...
-
DOB violation May 3, 2021
C-CONSTRUCTION OTHER OPTIONAL
-
Alteration Type II
HUNTER COLLEGE WEST BUILDING, FISP CYCLE 8 RELATED EXTERIOR FACADE REPAIRS AS PER THE PLANS FILED INCLUDING, REMOVAL ...
2020
-
DOB violation Oct 9, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Oct 9, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Oct 9, 2020
E-ELEVATOR ELEVATORREQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records