Job filings
157-159 East 75 Street, Manhattan • Block 01410 • Lot 0024
16 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Aug 10, 2018 | 122431984 | Alteration Type II | SIGNED OFF | FILING APPLICATION FOR PARTIAL RENOVATION OF 4TH FLOOR APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $206,784 | 157 EAST 75TH STREET CORP. |
| Aug 25, 2016 | 122263004 | Alteration Type II | SIGNED OFF | INSTALL ONE GAS METER, ONE GAS RISER, REMOUNT ONE GAS METER, REPLACE AND RELOCATE ONE ELECTRICAL PANEL, THE PROPERTY ... | $11,000 | 157 E75 CP |
| Mar 23, 2016 | 122136919 | Alteration Type II | SIGNED OFF | INSTALL SPLIT SYSTEM HVAC, VENTILATE POWDER ROOM, NO CHANGE TO USE, EXITS OF OCCUPANCY | $32,000 | 157 E75 CP |
| Jan 19, 2016 | 122522010 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | RENOVATE APT B-W. REPLACE PLUMBING FIXTURES ON EXISTING ROUGHING. REPLACE EXTERIOR DOOR. INSTALL MINI SPLIT SYSTEM. N... | $60,000 | 157 EAST 75 STREET CORP |
| Nov 24, 2014 | 103776987 | Alteration Type II | SIGNED OFF | Renovate 4th floor apartment. Work to include general construction and plumbing. No change to use, egress or occupancy. | $25,000 | 157 E. 75th St. Corp. |
| Feb 26, 2008 | 104730935 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF A HEAVY DUTY SHED 75' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WI... | $0 | MAUTNER-GLICK CORP. |
| Dec 7, 2007 | 110038655 | Alteration Type II | PLAN EXAM - APPROVED | RECONSTRUCT THE ROOF BULKHEADS ANDREPLACE EXISTING CORRODED STEEL IN KIND AT ROOF STRUCTURES AS PER DRAWNSNO CHANGES | $25,000 | MAUTNER-GLICK CORP |
| Dec 7, 2007 | 110038646 | Alteration Type II | PLAN EXAM - APPROVED | RECONSTRUCT THE ROOF BULKHEADS AND REPLACE EXISTING CORRODED STEEL IN KI ND AT THE ROOF STRUCTURES, AS SHOWN ON THE D... | $25,000 | MAUNTER-GLICK CORP. |
| Nov 16, 2007 | 104730917 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF SCAFFOLD 57' LONG BY 54' HIGH (SHED BEING FILED SEPARATELY) DURING FACADE REPAIR. NO CHANGES IN USE, ... | $0 | MAUTNER-GLICK CORP. |
| Aug 15, 2007 | 104222235 | Alteration Type II | SIGNED OFF | MINOR DEMOLITION, INSTALLATION OF NEW DRYWALL PARTITIONS, THROUGH WALL A/C UNITS AND PLUMBING FIXTURES AS PER PLANS F... | $150,000 | 157 EAST 75 ST. CORP. c/o MAUTNE |
| May 22, 2007 | 104700478 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Remove and replace existing roofing system and exterior facade repairs along exterior elevations of 157 & 161 Eas... | $260,000 | Mautner-Glick Corp. |
| Jan 19, 2006 | 103824989 | Alteration Type III | SIGNED OFF | Install scaffold 57ft long by 40ft high with an interior chute for debris at 157 - 161 East 75th Street - during reme... | $0 | 157 E. 75th Street Corp. |
| Jan 19, 2006 | 103824970 | Alteration Type III | SIGNED OFF | Install heavy duty sidewalk shed a total of 57 ' long at 157-161 East 75th Street - during remedial repairs. Work sha... | $0 | 157 E. 75th Street Corp. |
| Jan 5, 2006 | 104278595 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF 20' SIDEWALK SHED FOR THE PURPOSE OF FACADE INSPECTION. THE SIDEWALK SHED WILL COMPLY WITH LL33/91 AN... | $0 | 157 EAST 75TH STREET CORP |
| Dec 1, 2003 | 103619185 | Alteration Type II | PLAN EXAM - APPROVED | PERFORM MECHANICAL WORK IN CONJUNCTION WITH APARTMENT RENOVATION. NO CHANGE TO USE, OCCUPANCY, EGRESS OR FIREPROTECTION. | $2,000 | 157 EAST 75TH STREET CORPORATION |
| Jun 21, 2000 | 102716704 | Alteration Type II | PLAN EXAM - APPROVED | MINOR PARTITION WORK IN EXISTING APARTMENT. ALL AS PER PLANS AND APLICATIONS FILED HEREWITH. THERE IS NO CHANGE IN US... | $5,000 | MAUTNER & GLICK CORP |