Job filings
121 East 77 Street, Manhattan • Block 01412 • Lot 0058
63 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Mar 31, 2025 | 140559287 | Alteration Type II | SIGNED OFF | FILING OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH ALT-1 APPLICATION 12119184 2 | $1,000 | THE ALLEN STEVENSON SCHOOL |
| Jan 15, 2025 | 123427096 | Alteration Type II | SIGNED OFF | INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM | $200,000 | THE ALLEN STEVENSON SCHOOL |
| Jan 14, 2025 | 121191842 | Alteration Type I | PERMIT ISSUED - ENTIRE JOB/WORK | — | $9,149,000 | ALLEN STEVENSON SCHOOL |
| Nov 15, 2023 | 140546773 | Alteration Type II | SIGNED OFF | — | $990,000 | THE ALLEN-STEVENSON SCHOOL |
| Mar 3, 2023 | 140856580 | Alteration Type III | SIGNED OFF | INSTALLATION OF A TEMPORARY HOIST SUPPORT RUNBACK PLATFORM FOR A P/M HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL C... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Mar 2, 2023 | 123206119 | Alteration Type III | SIGNED OFF | INSTALLATION OF A PERSONNEL/MATERIAL HOIST AS PER PLANS IN CONJUNCTION WITH BUILDING ENLARGEMENT. NO CHANGE IN USE, E... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Feb 24, 2023 | 140798457 | Alteration Type II | SIGNED OFF | INSTALL FUEL STORAGE TANK IN CELLAR AS PER PLANS. INSTALL NEW FUEL OIL SUPPLY AND RETURN PIPING FROM CELLAR TO ROOF. ... | $150,000 | THE ALLEN STEVENSON SCHOOL |
| Dec 14, 2022 | 140868951 | Alteration Type III | SIGNED OFF | INSTALLATION OF ROOF PROTECTION AT ADJACENT PROPERTIES AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPARATELY. ... | $0 | REPUBLIC SCAFFOLD HOIST CO |
| Dec 8, 2022 | 140868675 | Alteration Type III | SIGNED OFF | INSTALLATION OF A TEMPORARY OVERHEAD/ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE,... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Jul 27, 2022 | 122166967 | Alteration Type II | SIGNED OFF | INSTALLATION OF TEMPORARY LPC MOCKUP ON THE ROOF LEVEL. TEMPORARY ARCHITECTURAL AND STRUCTURAL WORKTYPES. NO CHANGE T... | $5,000 | THE ALLEN STEVENSON SCHOOL |
| Jul 18, 2022 | 122639305 | Alteration Type III | SIGNED OFF | HEREWITH FILING A CONSTRUCTION FENCE IN CONJUNCTION WITH ALT. I 121191842 | $0 | THE ALLEN-STEVENSON SCHOOL |
| Apr 6, 2021 | 140919754 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION OF THE SOUTH BUILDING SIXTH FLOOR (LOCKERS AND FITNESS. INSTALLATION OF NON-BERING PARTITIONS, HU... | $50,000 | THE ALLEN-STEVENSON SCHOOL |
| Feb 22, 2021 | 123709371 | Alteration Type II | SIGNED OFF | REPLACE EXISTING BOILERS WITH 2 NEW GAS CONDENSING BOILER UNITS TO SINGLE FLUE AS PER PLAN | $20,000 | THE ALLEN STEVENSON SCHOOL |
| Jun 24, 2020 | 140917523 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | INTERIOR RENOVATION OF THE SOUTH BUILDING SIXTH FLOOR (LOCKERS AND FITNESS ROOMS). INSTALLATION OF NON-BEARING PARTIT... | $50,000 | THE ALLEN-STEVENSON SCHOOL |
| Jan 22, 2020 | 123805999 | Alteration Type II | SIGNED OFF | FILING TO INSTALL FIRE SUPPRESSION SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO OTHER WORK TO BE DONE. NO CHANGE IN USE... | $2,000 | ALLEN STEVENSON SCHOOL |
| Dec 17, 2019 | 140588077 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | TRIBOROUGH SCAFFOLDING & HOISTIN |
| Dec 17, 2019 | 140587997 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. ONE SECTION OF SHED IS ON THE ROADWAY AND SHALL BE PE... | $0 | TRIBOROUGH SCAFFOLDING & HOISTIN |
| Sep 16, 2019 | 123895838 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM | $40,000 | THE ALLEN STEVENSON SCHOOL |
| Aug 27, 2019 | 123863266 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | ADDITIONS TO THE EXISTING BUILDING FIRE ALARM SYSTEM | $80,000 | THE ALLEN STEVENSON SCHOOL |
| Aug 13, 2019 | 123710074 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | MEANS AND METHODS FOR ROOF REMOVAL IN CONJUCTION WITH ALTERATION-1 APPLICATION 121191842. USE OF MECHANICAL AND HANDH... | $1,000 | THE ALLEN STEVENSON SCHOOL |
| Jul 16, 2019 | 123879491 | Alteration Type II | PRE-FILING | REPLACE EXISTING BOILERS WITH 2 NEW GAS CONDENSING BOILER UNITS CONNECTED TO SINGLE FLUE AS PER PLANS. | $20,000 | THE ALLEN STEVENSON SCHOOL |
| Feb 20, 2019 | 122882434 | Alteration Type II | SIGNED OFF | HEREWITH FILING TO INSTALL INTERIOR TEMPORARY LATERAL BRACING OF MASONRY WALL ON THE 3RD AND 4TH FLOOR. NO AFFECT TO ... | $10,000 | THE ALLEN-STEVENSON SCHOOL |
| Nov 27, 2018 | 123550166 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR A TEMPORARY CLASSROOM. INSTALLING RATED AND NON-BEARING PARTITIONS AND GYP CEILING. NO CHANGE IN ... | $100,000 | THE ALLEN-STEVENSON SCHOOL |
| Sep 20, 2018 | 123576086 | Alteration Type II | SIGNED OFF | HEREWITH FILING SPRINKLE WORK-TYPE FOR 6TH FLOOR TEMPORARY CLASSROOM. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $25,000 | THE ALLEN-STEVENSON SCHOOL |
| Jul 23, 2018 | 123430661 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM | $25,000 | THE ALLEN STEVENSON SCHOOL |
| Jun 18, 2018 | 123577085 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM | $10,000 | THE ALLEN STEVENSON SCHOOL |
| Apr 19, 2017 | 122966923 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | HEREWITH FILING FOR INTERIOR PLUMBING UNDERGROUND PIPING IN CONJUNCTION WITH ALT.1 #121191842. NO CHANGE IN USE, OCCU... | $200,000 | THE ALLEN-STEVENSON SCHOOL |
| Mar 9, 2017 | 140614878 | Alteration Type II | PLAN EXAM - IN PROCESS | TEMPORARY SHORING OF EXISTING STAIRCASE ALL FLOORS IN CONJUNCTION WITH ALT-1 121191842 | $100,000 | THE ALLEN STEVENSON SCHOOL |
| Dec 13, 2016 | 122392339 | Demolition | SIGNED OFF | — | $0 | THE ALLEN-STEVENSON SCHOOL |
| Dec 12, 2016 | 140584464 | Alteration Type II | PLAN EXAM - IN PROCESS | HEREWITH FILING LATERAL BRACING OF MASONRY WALL. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $10,000 | THE ALLEN-STEVENSON SCHOOL |
| Sep 20, 2016 | 122436471 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | APPLICATION FILED HEREWITH TO REMOVE INTERIOR NON-LOAD BEARING PARTITIONS | $5,000 | THE ALLEN-STEVENSON SCHOOL |
| Sep 20, 2016 | 122888410 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | COMBINATION OF EXISTING 6 STORIES EDUCATION BUILDING AND TOWNHOUSE. THE EXISTING SYSTEM WILL STAY IN FULL FORCE UNTIL... | $400,000 | THE ALLEN-STEVENSON SCHOOL |
| Aug 16, 2016 | 122670207 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | HEREWITH FILING BUILDER'S PAVEMENT PLAN. | $0 | ALLEN-STEVENSON SCHOOL |
| Jan 19, 2016 | 122658409 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | CONVERT EXISTING WET SPRINKLER SYSTEM TO NEW DRY PIPE SYSTEM AND ASSOCIATED COMPONENTS AT THE CELLAR, AS PER PLANS FI... | $15,000 | THE ALLEN-STEVENSON SCHOOL |
| Dec 3, 2015 | 140430068 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE NO CH... | $0 | ALBA SERVICES INC. |
| Sep 1, 2015 | 122488502 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | FILING FOR SPRINKLER REMOVAL IN CONJUNCTION WITH PARTIAL DEMOLITION APPLICATION # 122383036 | $5,000 | THE ALLEN-STEVENSON SCHOOL |
| Jun 23, 2015 | 122383241 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | APPLICATION FILED HEREWITH FOR TEMPORARY WALL BRACING AS PER PLAN | $10,000 | THE ALLEN-STEVENSON SCHOOL |
| Apr 20, 2015 | 122383036 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | APPLICATION FILED HEREWITH FOR PARTIAL DEMO AS PER PLANS | $50,000 | THE ALLEN-STEVENSON SCHOOL |
| Nov 7, 2014 | 122188319 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2008 NYC BUILDING CODE.... | $0 | THE ALLEN-STEVENSON SCHOOL |
| Jan 7, 2014 | 110151549 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 100 LINEAR FEET BY 10 FEET HIGH MAXIMUM HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS PE... | $0 | ALLEN STEVENSON SCHOOL |
| Jan 7, 2014 | 110151558 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 50 LINEAR FEET BY 65 FEET HIGH TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION SHALL CO... | $0 | ALLEN STEVENSON SCHOOL |
| Jan 7, 2014 | 110191783 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 50 LINEAR FEET BY 65 FEET MAXIMUM HIGH TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION ... | $0 | ALLEN STEVENSON SCHOOL |
| Jan 7, 2014 | 110191818 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 50 LINEAR FEET BY 10 FEET HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS PER SQUARE ... | $0 | ALLEN STEVENSON SCHOOL |
| Jul 24, 2012 | 121133987 | Alteration Type II | PLAN EXAM - DISAPPROVED | PROPOSED ROOF CANOPY AND REPLACEMENT OF EXISTING RECREATION CAGE AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS... | $1,000,000 | ALLEN-STEVENSON SCHOOL |
| May 31, 2011 | 120540753 | Alteration Type II | SIGNED OFF | PROPOSE TO INSTALL ACCESSORY METAL TOOL SHED IN REAR YARD, NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,280 | THE ALLAN STEBVENSON SCHOOL |
| Feb 3, 2011 | 110283185 | Alteration Type II | SIGNED OFF | Filing for installation of new railing & stainless steel post sleeves, misc. brick replacement & repointing, ... | $1,600,000 | Allen Stevenson School |
| Jul 20, 2007 | 104741228 | Alteration Type I | SIGNED OFF | No Work Application filed to obtain a correct Certificate of Occupancy for the Allen Stevenson School. See additional... | $1 | The Allen Stevenson School |
| Mar 12, 2007 | 103008601 | Alteration Type I | SIGNED OFF | Install mechanical and plumbing as per plans filed herewith. | $0 | The Allen-Stevenson School |
| Mar 12, 2007 | 103256183 | Alteration Type I | SIGNED OFF | Structural design for the enlargement of floors 3-5. | $0 | The Allen-Stevenson School |
| Aug 14, 2006 | 103543319 | Place of Assembly | COMPLETED | — | $0 | THE ALLEN STEVENSON SCHOOL |