Jhs 45 Wagner Hses Rec Area, Manhattan • Block 01430 • Lot 0005

30 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Aug 28, 2023 141020071 Alteration Type II SIGNED OFF INSTALLATION OF NEW PHOTOVOLTAIC SOLAR PANEL SYSTEM ON SCHOOL BUILDING ROOF. NO CHANGE ON USE, EGRESS OR OCCUPANCY. $703,456 GENERATE HUDSON SOLAR LLC
Oct 20, 2022 103646823 Alteration Type II SIGNED OFF MASONRY WALL RESTORATION TO INCLUDE EXTENDING THE PARAPET WALLS AT THE TOP OF ALL WALL. REMOVAL AND INSTALLATION OF N... $6,000,000 SCHOOL CONSTRUCTION AUTHORITY
Jul 20, 2022 141020044 Alteration Type II PLAN EXAM - IN PROCESS INSTALLATION OF PHOTOVOLTAIC SOLAR PANEL SYSTEM ON SCHOOL BUILDING ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $703,456,000 GENERATE HUDSON SOLAR LLC
Jun 3, 2021 103648974 Alteration Type III SIGNED OFF SF/PS167M - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD), I... $0 NYC SCA
Feb 23, 2021 103648947 Alteration Type III SIGNED OFF SH/PS167M - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED), IN CO... $0 NYC SCA
Aug 26, 2020 103648108 Alteration Type III SIGNED OFF SH/PS167M - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY SH... $0 NYC SCA
Jun 10, 2020 103648983 Alteration Type III SIGNED OFF FN/PS167M - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE), IN C... $0 NYC SCA
Jun 28, 2019 103652003 Alteration Type II PLAN EXAM - APPROVED INSTALLATION OF SPLIT-COOLING SYSTEM FOR GYMNASIUM AND CAFETERIA. $420,000 DEPT. OF EDUCATION SCA
Oct 15, 2018 103650746 Alteration Type II PLAN EXAM - APPROVED PROVIDE 16 MULTIPLE DX SPLIT SYSTEMS WITH RELATED PIPING & CONDUIT, AND WALL PENETRATIONS WITH FIRE-STOPPING WHER... $750,000 SCHOOL CONSTRUCTION AUTHORITY
Feb 12, 2018 103648876 Alteration Type II SIGNED OFF REMOVE/REPLACE EXIST. FLOORING. REMOVE EXIST. BUILT-IN CASEWORK. INSTALL NEW SCIENCE LAB EQUIPMENT AND CASEWORK PER D... $345,257 NYC SCHOOL CONSTRUCTION AUTHORIT
Aug 15, 2016 140535892 Alteration Type II PLAN EXAM - IN PROCESS REMOVE/REPLACE EXIST. FLOORING. REMOVE EXIST. BUILT-IN CASEWORK. INSTALL NEW SCIENCE LAB EQUIPMENT AND CASEWORK PER D... $345,257 NYC SCHOOL CONSTRUCTION AUTHORIT
Oct 14, 2015 103645682 Alteration Type II SIGNED OFF IS 167M- FILED HEREWITH ENERGY ANALYSIS ASSOCIATED WITH REPLACEMENT OF EXISTING LIGHTING FIXTURES AS PER PLAN. $956,739 NYCSCA
Jul 23, 2015 103643666 Alteration Type II SIGNED OFF AUDITORIUM UPGRADE INCLUDING REPLACEMENT OF HOUSE AND THEATER LIGHTING WITH ENERGY EFFICIENT FIXTURES AND REPAIR OF A... $457,000 SCHOOL CONSTRUCTION AUTHORITY
Jun 24, 2015 102125353 Place of Assembly COMPLETED $0 NYCSCA
May 21, 2015 103643826 Alteration Type II SIGNED OFF P.S. 167-M PROVIDE ALL EXCAVATION, BACKFILLING AND RECONSTRUCTION OF STREET, SIDEWALKS AND LAWNS FOR REMOVAL AND INST... $200,000 SCHOOL CONSTRUCTION AUTHORITY
May 8, 2015 103647644 Alteration Type II PLAN EXAM - APPROVED $375,000 DEPARTMENT OF EDUCATION
Mar 13, 2015 140068520 Alteration Type III SIGNED OFF INSTALLATION OF SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER T... $0 NYC SCA
Jan 20, 2015 102416716 Alteration Type II SIGNED OFF JHS167 WAGNER WINDOWS, CURTAIN WALL & DR REPLACEMENT $5,000,000 NY SCHOOL CONSTRUCTION AUTHORITY
Aug 11, 2014 103889277 Alteration Type II SIGNED OFF PROVIDE A SPLIT UNIT TYPE AIR CONDITIONING SYSTEM IN A LOCAL NETWORK (LAN) CLOSET. $15,000 NYC SCA
Mar 20, 2014 103879803 Alteration Type III SIGNED OFF $0 NYC SCA
Mar 20, 2014 103879812 Alteration Type III SIGNED OFF $0 NYC SCA
Mar 20, 2014 103879821 Alteration Type III SIGNED OFF $0 NYC SCA
Jun 4, 2010 103889776 Alteration Type II PLAN EXAM - APPROVED REMOVE EXISTING (2) OS & Y VALVES , BASKET STRAINER,4" CHECK VALVE WITH ASSOCIATED PIPING & FITTINGS .INSTALL... $30,591 SCA
Mar 4, 2008 102395668 Alteration Type II SIGNED OFF IS167 GENERAL LIBRARY RENOVATION REMOVENON ST PARTITION BTWN RM220 & RM 222 REMOVE 2 DRS REPLACE 1 ADDRESS VIOLAT... $419,285 NY SCHOOL CONSTRUCTION AUTHORITY
Apr 5, 2004 102121044 Alteration Type II SIGNED OFF JHS167 MODIFICATION OF THE PARTITIONS & STEPS $170,000 NY SCHOOL CONSTRUCTION AUTHORITY
Oct 10, 2003 102125344 Place of Assembly PERMIT ISSUED - ENTIRE JOB/WORK $0 NYC SCA
Oct 10, 2003 102125335 Place of Assembly PERMIT ISSUED - ENTIRE JOB/WORK $0 NYC SCA
Jun 23, 2003 102262686 Alteration Type III SIGNED OFF JHS167 FENCE IN CONJUNCTION W/102121044 $0 NY SCHOOL CONSTRUCTION AUTHORITY
Jun 11, 2002 102037430 Alteration Type II SIGNED OFF JHS167REPAIR AND REPLACE 17 ROOF DRAINS REFLASH 42 VENT STACKS AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCC... $20,000 NY SCHOOL CONSTRUCTION AUTHORITY
Jan 8, 2002 102129457 Alteration Type III SIGNED OFF JHS SIDEWALK SHED FOR FACADE REPAIRS OF NYC SCHOOL $0 NY SCHOOL CONSTRUCTION AUTHORITY