Skip to content

Job filings

327 East 64 Street, Manhattan • Block 01439 • Lot 0014

38 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Oct 1, 2021 123423508 Alteration Type II SIGNED OFF MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T... $30,000 MEMORIAL SLOAN-KETTERING CANCER
Sep 1, 2020 123584111 Alteration Type II SIGNED OFF MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER TH... $70,000 MEMORIAL SLOAN-KETTERING CANCER
May 26, 2020 121331816 New Building PERMIT ISSUED - ENTIRE JOB/WORK CONSTRUCT NEW BUILDING (OCC GP B) CONSTRUCTION FENCE $0 MEM HOSP FOR CANCER & ALLIED DIS
Mar 6, 2020 123249742 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM. $1,200 MEMORIAL SLOAN KETTERING
May 22, 2019 121331969 Alteration Type III SIGNED OFF BUILDERS PAVEMENT PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121331816. $0 MEMORIAL HOSPITAL FOR CANCER
Jul 5, 2018 122813116 Alteration Type III SIGNED OFF PLACE AND OPERATE PICK AND CARRY LIFTING EQUIPMENT DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE OCCUPANCY OR EG... $0 M. COHEN AND SONS, INC
Feb 7, 2018 140263293 Alteration Type III SIGNED OFF 12'-0' CURB CUT (2) 2'-6' SPLAYS - TOTAL = 17' CURB CUT LOCATED ON N/S OF EAST 64TH ST. AS SHOWN ON DRAWINGS FILED HE... $0 MEMORIAL HOSPITAL FOR CANCER
Feb 7, 2018 140263257 Alteration Type III SIGNED OFF 12'-0" CURB CUT WITH (2) 2'-6" SPLAYS = 17'-0" CURB CUT TOTAL ON N/S OF EAST 64TH STREET AS SHOWN ON DRAWINGS FILED H... $0 MEMORIAL HOSPITAL FOR CANCER
Feb 7, 2018 140263113 Alteration Type III SIGNED OFF 15'-0" CURB CUT WITH (2) 2'-6" SPLAYS - TOTAL = 20'-0" CURB CUT LOCATED ON N/S OF EAST 64TH ST. AS SHOWN ON DRAWINGS ... $0 MEMORIAL HOSPITAL FOR CANCER
Feb 7, 2018 121725669 Alteration Type II SIGNED OFF INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMNICAT... $1,000 MEMORIAL HOSPITAL FOR CANCER
Feb 1, 2018 122489306 Alteration Type II SIGNED OFF INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM ON SUBCELLAR 2, SUBCELLAR 1 CONSTRUC... $1,000 MEMORIAL HOSPITAL FOR CANCER
Jan 23, 2018 122489280 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM BY ADDING THE FOAM WET SPRINKLE R SYSTEM ON SC2 (CONSTRUCTION) C3 CELL... $1,000 MEMORIAL HOSPITAL FOR CANCER
Jan 23, 2018 122489299 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM BY ADDING FOAM WET SPRINKLER SY STEM ON SC2(CONSTRUCTION)/C3 CELLAR (M... $1,000 MEMORIAL HOSPITAL FOR CANCER
Dec 12, 2017 122657589 Alteration Type III SIGNED OFF INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE ... $0 SAFWAY ATLANTIC LLC
Dec 12, 2017 122531867 Alteration Type III SIGNED OFF INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. ... $0 SAFWAY ATLANTIC LLC
Dec 12, 2017 122574598 Alteration Type III SIGNED OFF INSTALLATION OF A DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY.... $0 SAFWAY ATLANTIC LLC
Dec 12, 2017 122574589 Alteration Type III SIGNED OFF SHAFT HOIST: INSTALLATION OF A SINGLE 5300 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING NEW BUILDING CONSTRUCTION, FI... $0 SAFWAY ATLANTIC LLC
Dec 11, 2017 122556698 Alteration Type III SIGNED OFF INSTALLATION OF 45 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWA... $0 SAFWAY ATLANTIC LLC
Dec 11, 2017 122524928 Alteration Type III SIGNED OFF INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE ... $0 SAFWAY ATLANTIC LLC
Dec 4, 2017 121333770 Alteration Type II SIGNED OFF INSTALLATION OF NEW SPRINKLER SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. IN ... $1,000 MEMORIAL HOSPITAL FOR CANCER
Nov 1, 2017 123172805 Alteration Type II PLAN EXAM - APPROVED INSTALLATION OF MANIFOLD FOR CO2, ARGON, ULTRA HIGH PURITY NITROGEN, AND HIGH PRESSURE NITROGEN.NO CHANGE TO USE, EGR... $30,000 MEM HOSP FOR CANCER & ALLIED DIS
Sep 1, 2017 121333761 Alteration Type II SIGNED OFF INSTALLATION OF NEW STANDPIPE SYSTEM AS SHOWN ON DRAWING FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. IN C... $1,000 MEMORIAL HOSPITAL FOR CANCER
Aug 7, 2017 122498948 Place of Assembly COMPLETED $0 MEMORIAL HOSPITAL FOR CANCER
Aug 1, 2017 122710254 Alteration Type II SIGNED OFF INSTALL BOILER AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH ... $1,000 MEMORIAL HOSPITAL FOR CANCER
Aug 1, 2017 122710263 Alteration Type II SIGNED OFF INSTALLATION OF EMERGENCY GENERATOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED... $2,000 MEMORIAL HOSPITAL FOR CANCER
Jul 21, 2017 122948891 Alteration Type II SIGNED OFF INSTALL LIQUID NITROGEN TANKS AND PIPING TO SUPPORT THE LABORATORIES IN CONJUCTION WITH NB#121331816. NO CHANGE IN US... $1,000 MEM HOSP FOR CANCER & ALLIED DIS
Apr 28, 2017 122861876 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALLATION OF FOAM SYSTEM HEADS FOR FIRE SUPPRESSION SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, ... $1,000 MEMORIAL HOSPITAL FOR CANCER
Apr 28, 2017 122860877 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALLATION OF FOAM SPRINKLER HEADS FOR FIRE SUPPRESSION SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN US... $1,000 MEMORIAL HOSPITAL FOR CANCER
Mar 21, 2017 122869734 Alteration Type III PLAN EXAM - APPROVED FIRE PROTECTION PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. $1,000 MEMORIAL HOSPITAL FOR CANCER
Aug 16, 2016 122643274 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 MEMORIAL HOSP FOR CANCEN & ALLIE
Dec 12, 2014 121714537 Alteration Type III SIGNED OFF INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE.NO CHANG... $0 ARSENAL SCAFFOLD INC.
Dec 12, 2014 121593329 Alteration Type III SIGNED OFF INSTALLATION OF 167 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... $0 ARSENAL SCAFFOLD INC.
Dec 12, 2014 121703987 Alteration Type III SIGNED OFF INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, ... $0 ARSENAL SCAFFOLD INC.
Jun 20, 2014 121605138 Demolition SIGNED OFF FULL DEMOLITION OF TWO STORY GARAGE USING MECHANICAL MEANS. $0 MEM HOSP FOR CANCER & ALLIED DIS
Sep 28, 2012 120936620 Alteration Type II SIGNED OFF FILING FOR TEMPORARY INTERIOR GARAGE DEBRIS SAFETY NETTING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGR... $50,000 HERTZ CORPORATION
Sep 28, 2012 120595668 Alteration Type II SIGNED OFF FILING FOR GARAGE REPAIRS TO PATCH DETERIORATED CONCRETE FLOOR SLABS, REMOVE AND REPLACE EXISTING SLAB ON GRADE, INST... $335,000 HERTZ CORPORATION
Apr 30, 2007 104313823 Alteration Type II SIGNED OFF PROPOSE TO INSTALL NEW, CHEMICAL OVERHEAD FIRE SUPPRESSION SYSTEM TO PROTECT GASOLINE FUELING AREA OF SERVICE STATION... $10,000 THE HERTZ CORPORATION
May 4, 2001 102813136 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK Concrete slab repair/replacement, steel framing repair, traffic bearing membrane installation at various locations. N... $269,200 Hertz Corporation