Skip to content

Job filings

Memorial Sloan Kettering Center, Manhattan • Block 01462 • Lot 0005

538 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
May 22, 2013 103981498 Alteration Type II SIGNED OFF MECHANICAL MODIFICATIONS TO CONFORM WITH NEW ARCHITECTURAL LAYOUT AS PE PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $50,000 SLOAN KETTERING MEMORIAL HOSP.
May 22, 2013 120419314 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING WORK ON THE 4TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. (LINAC 442) $52,000 MEMORIAL SLOAN KETTERING
May 21, 2013 120756324 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 2ND FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. (MSK #U0800200-NUCLEAR MEDICINE PH, 4 & 5) $12,000 MEMORIAL SLOAN KETTERING
May 21, 2013 104807835 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK $250,000 SLOAN KETTERING MEMORIAL HOSPITA
May 13, 2013 104763695 Alteration Type II SIGNED OFF Propose to repair and replace deteriorated mortar with new. Provide new gaskets on the existing windows, general repa... $250,000 Memorial Sloan Kettering Cancer
May 13, 2013 104927028 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 11TH FLOOR; INSTALLATION OF 11 NEW SPRINKLER HEADS AND 8 NEW PRE-ACTION HEADS. NO CHANGE IN OCC... $6,000 MEMORIAL SLOAN KETTERING
May 3, 2013 120122973 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 9TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. $7,000 MEMORIAL SLOAN KETTERING
Apr 29, 2013 120917240 Alteration Type II SIGNED OFF ALTERATIONS TO EXISTING APPROVED INDIVIDUALLY-CODED INTERIOR FIRE ALARM SYSTEM WITH ONE- AND TWO-WAY EMERGENCY VOICE ... $9,200 MEMORIAL SLOAN-KETTERING
Apr 26, 2013 121422157 Alteration Type II SIGNED OFF CREATE PRIVATE OFFICE WITH NEW SUITE ENTRY DOOR. NO CHNAGE IN OCCUPANCY, USE OR EGRESS. $57,000 MEMORIAL SLOAN KETTERING
Apr 25, 2013 104783432 Alteration Type II SIGNED OFF PROPOSE TO REMOVE AND REPLACE DAMAGED BRICKS, RESET EXISTING LIMESTONE, REMOVE AND REPLACE EXISTING WINDOWS. FIX SEAL... $300,000 MEMORIAL SLOAN-KETTERING CANCER
Apr 19, 2013 104658014 Alteration Type II SIGNED OFF MECHANICAL WORK AS PRE PLANS, NO CHANGEIN USE, EGRESS OR OCCUPANCY $50,000 SLOAN KETTERING MEMORIAL HOSPITA
Apr 19, 2013 104782111 Alteration Type II SIGNED OFF PROPOSE TO PROVIDE GENERAL FACADE REPAIR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $300,000 MEMORIAL SLOAN-KETTERING CANCER
Apr 10, 2013 120931607 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE GROUND FLOOR. (WORK BEING DONE AT 444 EAST 68TH STREET) NO CHANGE IN OCCUPANCY, USE OR EGRESS. $7,000 MEMORIAL SLOAN KETTERING
Apr 9, 2013 120917268 Alteration Type II SIGNED OFF NEW HI/LOW OXYGEN MEDICAL GAS DETECTION SYSTEM FOR 6TH FLOOR MEDICAL GAS STORAGE ROOM AT HAUPT BUILDING $9,200 MEMORIAL SLOAN-KETTERING
Apr 9, 2013 120917259 Alteration Type II SIGNED OFF ALTERATIONS AND ADDITIONS TO EXISTING APPROVED INDIVIDUALLY-CODED INTERIOR FIRE ALARM SYSTEM WITH ONE- AND TWO-WAY EM... $973,600 MEMORIAL SLOAN-KETTERING
Apr 8, 2013 120931616 Alteration Type II SIGNED OFF MECHANICAL WORK ON THE GROUND FLOOR. (WORK BEING DONE AT 444 EAST 68TH STREET) NO CHANGE IN OCCUPANCY, USE OR EGRESS. $25,000 MEMORIAL SLOAN KETTERING
Apr 2, 2013 110364043 Alteration Type III SIGNED OFF INSTALLATION OF 300 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SH... $0 YORK SCAFFOLD EQUIPMENT CORP
Apr 2, 2013 120905217 Alteration Type III SIGNED OFF INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH... $0 MEMORIAL HOSPITAL FOR CANCER
Mar 26, 2013 120563951 Alteration Type II SIGNED OFF MODIFICATION TO THE EXISTING FIRE ALARM ON THE 5TH FLOOR. NO CHANGE IN OCCUPAN CY, USE OR EGRESS. $3,000 MEMORIAL SLOAN KETTERING
Mar 21, 2013 120978736 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 2ND FLOOR. NO CHANGE INOCCUPANCY, USE OR EGRESS. $12,000 MEMORIAL SLOAN KETTERING
Mar 8, 2013 104766709 Alteration Type III SIGNED OFF Erect 60' of Temporar Heavy Duty Sidewalk Shed 300 psf for protection during brick replacement on exterior parapet at... $0 Memorial Sloan Kettering Cancer
Mar 4, 2013 120468145 Alteration Type II SIGNED OFF $20,000 MEMORIAL SLOAN KETTERING
Mar 1, 2013 121448184 Alteration Type II PLAN EXAM - DISAPPROVED PLUMBING WORK AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH FOR THE TWENTIETH FLOOR EXECUTIVE SUITE (19TH FL... $23,800 MEMORIAL SLOAN KETTERING -1275 Y
Mar 1, 2013 121525475 Alteration Type II APPLICATION PROCESSED - ENTIRE REMOVE AND INSTALL SPRINKLER HEADS ALONG WITH RELATED PIPING FOR THE TWENTIETH FLOOR EXECUTIVE SUITE (19TH FLOOR CONS... $100,000 MEMORIAL SLOAN KETTERING -1275 Y
Feb 28, 2013 120776749 Alteration Type II SIGNED OFF MECHANICAL WORK ON THE 5-7 FLOORS AND ROOF. NO CHANGE IN OCCUPANCY, USE OR EGRESS. (WORK IN RO BUILDING 411-419 EAST ... $75,000 MEMORIAL SLOAN KETTERING
Dec 26, 2012 104733184 Alteration Type II SIGNED OFF FIER ALRAM MODIFICATIONS ON THE 2NDFLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY. $10,000 Memorial Hospital for Cancer
Dec 13, 2012 120837933 Alteration Type II SIGNED OFF PROPOSE TO FILE FOR INSTALLATION OF NEW AUTOMATIC HEAT DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER ALARM SYS... $8,400 MEMORIAL HOSPITAL FOR CANCER
Dec 4, 2012 120738906 Alteration Type II SIGNED OFF INTERIOR DEMO WORK ON THE 1ST FLOOR WORK BEING IN THE RO BUILDING 411-419 EAST 67TH STREET ( MSK #10000183) $212,000 MEMORIAL SLOAN KETTERING
Nov 29, 2012 120954119 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING WORK FOR INSTALLATION OF CO2 MANIFOLD SYSTEM ON THE 6 FLOOR. $34,000 MEMORIAL SLOAN KETTERING
Oct 23, 2012 120687220 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 5 & 6 FLOORS. STANDPIPE WORK ON THE 5TH & 6TH FLOORS ONLY. NO CHANGE IN OCCUPANCY, USE ... $146,000 MEMORIAL SLOAN KETERING
Oct 3, 2012 120651927 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 1ST FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. (MSK# U1000124 COLUMN REINFORCEMENT PHASE 1) $10,000 V.P. FACILITIES MANAGEMENT
Sep 28, 2012 120583216 Alteration Type II SIGNED OFF PARTITION AND CEILING WORK ON THE 1ST AND 2ND FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. $200,000 MEMORIAL SLOAN-KETTERING
Sep 21, 2012 120591886 Alteration Type II SIGNED OFF PARTIAL DEMO WORK ON THE 5TH FLOOR ROOF. NO CHANGE IN OCCUPANCY, USE OR EGRESS . (DEMO AT 411-19 EAST 67TH STREET OR ... $200,000 MEMORIAL SLOAN-KETTERING
Aug 28, 2012 120645579 Alteration Type III SIGNED OFF INSTALLATION OF A HOIST US-60-RNU PERSONNEL/MATERIAL SINGLE CAGE HOIST AS PER PLANS DURING GENERAL CONSTRUCTION WORK.... $0 ALL SAFE, LLC
Aug 10, 2012 120645588 Alteration Type III SIGNED OFF INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 120' LONG X 8'-16' HIGH AS PER PLANS DURING GENERAL CONSTRUC... $0 ALL SAFE, LLC
Aug 10, 2012 120645597 Alteration Type III SIGNED OFF INSTALLATION OF A TEMPORARY SCAFFOLD WITH ACCESS STAIR TOWERS (FIELD LOCATED) ON THE EXISTING SIDEWALK SHED (FILED SE... $0 ALL SAFE, LLC
Aug 10, 2012 120646523 Alteration Type III SIGNED OFF INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS O... $0 ALL SAFE, LLC
Aug 10, 2012 120646532 Alteration Type III SIGNED OFF INSTALLATION OF A TEMPORARY PLYWOOD ENCLOSURE/FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, ... $0 ALL SAFE, LLC
Aug 10, 2012 120658671 Alteration Type III SIGNED OFF INSTALLATION OF A TEMPORARY TRAILER ON THE EXISTING SIDEWALK SHED (FILED SEPERATELY) AS PER PLANS DURING GENERAL CONS... $0 ALL SAFE, LLC
Jul 11, 2012 110401707 Alteration Type II SIGNED OFF FIRE ALARM MODIFICATIONS ON THE 2ND FLOOR, FLOUROSCOPY AREA. NO CHANGE IN OCCU PANCY, USE OR EGRESS. $12,000 MEMORIAL SLOAN KETTERING
Jul 6, 2012 121077182 Alteration Type III PLAN EXAM - DISAPPROVED FILING FIRE PROTECTION PLANS FOR MSK SUPER BLOCK ADDRESS AS FOLLOWS: 1275 YORK AVENUE(MEMORIAL HOSPITAL), 410 E. 68TH... $1,000 MEMORIAL SLOAN KETTERING
Jun 8, 2012 120657226 Alteration Type II SIGNED OFF MECHANICAL & PLUMBING WORK ON THE 1ST & 2ND FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS (MSK #U1000124 COLU... $400,000 MEMORIAL SLOAN KETTERING
May 16, 2012 120744472 Alteration Type II SIGNED OFF MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 4,5,6, ROOF( 7 FLOOR LEVEL ) ( WORK IN RO BUILDING 411-419 EAST... $32,000 MEMORIAL SLOAN KETTERING
Nov 17, 2011 120899144 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK ADDITION OF NEW SPRINKLERS HEADS ON THE 5TH AND 6TH FLOORS AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS ... $113,400 MEMORIAL SLOAN KETERING
Nov 10, 2011 120687211 Alteration Type I PERMIT ISSUED - ENTIRE JOB/WORK $450,000 MEMORIAL SLOAN KETTERING
Nov 5, 2011 110484155 Alteration Type II SIGNED OFF MODIFICATION OF FIRE ALARM WORK ON THE 2ND FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. $3,000 MEMORIAL SLOAN KETTERING
Oct 20, 2011 110027131 Alteration Type II SIGNED OFF DEMOLITION, PARTITIONS AND CEILING WORK ON THE 3RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. $10,000 MEMORIAL SLOAN KETTERING
Oct 14, 2011 102647263 Alteration Type II SIGNED OFF Remove and install sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress o... $30,000 Memorial H
Apr 27, 2011 110215712 Alteration Type II SIGNED OFF INSTALLATION OF A/C UNITS ON THE ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. $5,000 MEMORIAL SLOAN-KETTERING CANCER
Apr 7, 2011 110215730 Alteration Type II SIGNED OFF INSTALLATION OF A/C UNITS ON THE ROOF AS INDICATED ON THE DRAWINGS . NO CHANGE IN USE, EGRESS, OR OCCUPANCY. $168,000 MEMORIAL SLOAN KETTERING CANCER