Skip to content

Job filings

404-432 East 70 Street, Manhattan • Block 01464 • Lot 0030

64 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Feb 26, 2026 103676862 Alteration Type II SIGNED OFF REMOVE AND INSTALL FIRE ALARM DEVICES CONNECTED TO EXISTING SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN ... $10,000 CORNELL UNIVERSITY
Oct 23, 2025 140677970 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 WEILL CORNELL MEDICINE
Jan 28, 2022 121176324 Alteration Type III SIGNED OFF INSTALLATION OF HEAVY DUTY SIDEWALK SHED 16'L X 15'W AS PER PLANS. DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH NEW Y... $0 WEILL CORNELL MEDICAL COLLEGE
Jan 14, 2022 120955172 Alteration Type III SIGNED OFF ERECT TUBULAR STEEL SCAFFOLD STRUCTURE PER DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-362-44-SM, LL-52/05, CHAPTER ... $0 WEILL CORNELL MEDICAL COLLEGE
Jan 13, 2022 123894795 Alteration Type II SIGNED OFF MODIFICATIONS TO HVAC EQUIPMENT AND DUCTWORK WITH ASSOCIATED SPRINKLER WORK TO ACCOMMODATE ALTERATIONS TO THE EXISTIN... $80,000 WEILL CORNELL MEDICINE
Dec 30, 2021 120056964 Alteration Type III SIGNED OFF CONSTRUCTION FENCE (210 LINEAR FEET) FILED IN CONJUNCTION WITH APPLICATION #110397767 AT LASDON TERRACE CO. NO CHANGE... $0 WEILL CORNELL MEDICAL COLLEGE
Dec 15, 2021 103734568 Alteration Type II SIGNED OFF REMOVE UNUSED SPRINKLER HEADS IN AREAS O F STRUCTURE BEING REMOVED NO CH NGE IN USE EGRESS OR OCCUPANCY $30,000 WEIL MEDICAL
Dec 15, 2021 103765686 Alteration Type II SIGNED OFF Modifications to existing sprinkler system to allow for coverage throughout existing dormitory building. Modify exist... $800,000 WEILL MEDICAL COLLEGE OF CORNELL
Dec 10, 2021 123563009 Alteration Type II SIGNED OFF INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM. $100,000 WEILL CORNELL MEDICINE
Nov 22, 2021 140759114 Alteration Type III SIGNED OFF INSTALLATION OF TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SYSTEM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUI... $0 SAFWAY ATLANTIC LLC
Nov 22, 2021 123069259 Alteration Type III SIGNED OFF INSTALLATION OF A FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRU... $0 ALL SAFE LLC
Nov 22, 2021 123067821 Alteration Type III SIGNED OFF INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 34' LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO C... $0 ALL SAFE LLC
Nov 22, 2021 123069268 Alteration Type III SIGNED OFF INSTALLATION OF A TEMPORARY SCAFFOLD-TYPE PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, E... $0 ALL SAFE LLC
Nov 16, 2021 122877789 Alteration Type II SIGNED OFF MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS TO THE NEW OFFICES FOR THE NOT FOR PROFI... $10,000,000 WEILL CORNELL MEDICINE
Oct 14, 2021 123894802 Alteration Type II SIGNED OFF MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES WITH EXTERIOR ALTERATIONS TO ACCOMMODATE THE NEW ENTRANCE AND AWNIN... $100,000 WEILL CORNELL MEDICINE
Jul 13, 2021 123054942 Alteration Type II SIGNED OFF UPGRADE OF EXISTING IFA TO MANUAL & AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKL ER FIRE ALARM SYSTEM WITH VOICE CO... $100,000 WEILL CORNELL MEDICINE
Jun 18, 2021 140880688 Alteration Type III SIGNED OFF PROPOSED TEMPORARY STAIR AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. $0 ELYSIUM CONSTRUCTION
Jun 3, 2021 122877805 Alteration Type II SIGNED OFF MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS FOR THE NEW ACCESSORY FITNESS AREA AS IN... $200,000 WEILL CORNELL MEDICINE
Feb 12, 2020 123358286 Alteration Type II SIGNED OFF HVAC MODIFICATIONS INCLUDING THE REMOVAL AND RE-INSTALLATION OF MECHANICAL EQUIPMENT AND RELATED PLUMBING WORK TO ACC... $25,500 WEILL CORNELL MEDICINE
Dec 12, 2019 140880633 Alteration Type III PLAN EXAM - IN PROCESS PROPOSED TEMPORARY STAIR FOR EXISTING BUILDING WORK AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. $0 ELYSIUM CONSTRUCTION
Sep 5, 2018 120679462 Alteration Type III SIGNED OFF INSTALLATION OF ROOF PROTECTION AS PER DRAWINGS DURING CONSTRUCTION OPERATIONS AT THE ADJACENT BUILDING 445 EAST 69 S... $0 CORNELL UNIVERSITY
Sep 5, 2018 120738498 Alteration Type III SIGNED OFF INSTALLATION OF OVERHEAD PROTECTION AT 2ND FLOOR TERRACE AS ADDITIONAL PROTECTION DURING CONSTRUCTION OPERATIONS AT T... $0 CORNELL UNIVERSITY
Jul 6, 2018 123381205 Subdivision Improved COMPLETED TAX LOT REAPPORTIONMENT - LOTS 28 AND 30 ONLY. THIS IS SOLELY A TAX LOT REAPPORTIONMENT. BOTH TAX LOTS ARE INCLUDED I... $0 WEILL CORNELL MEDICAL COLLEGE
Mar 19, 2018 123194596 Alteration Type II SIGNED OFF LEGALIZATION OF 65 DOUBLE LARGE PARKING MECHANICAL LIFTS. ALL PREVIOUSLY INSTALLED BY NY STATE DORMITORY AUTHORITY. $25,000 WEILL CORNELL MEDICINE
Dec 21, 2017 103767602 Alteration Type II SIGNED OFF Partition modifications in existing dorm itory to accomodate mechanical throughout. Window and storefront replac emen... $14,650,000 WEILL MEDICAL COLLEGE OF CORNELL
Dec 14, 2017 121606155 Alteration Type II SIGNED OFF MODIFICATION TO HVAC EQUIPMENT AND DUCTWORK WITH ASSOCIATED PLUMBING AND SPRINKLER WORK TO ACCOMMODATE ALTERATIONS FO... $210,000 WEILL MEDICAL COLLEGE OF CORNELL
Oct 30, 2017 123324697 Alteration Type II SIGNED OFF FACADE REPAIR AT THE EXISTING LASDON HOUSE BUILDING. WORK AS PER PLANS FILED HEREWITH ONLY. NO CHANGE TO ZONING, USE,... $425,299 WEILL CORNELL MEDICINE
Sep 7, 2017 140691277 Alteration Type III PLAN EXAM - APPROVED FACADE SSP FILED IN CONJUNCTION WITH APPLICATION #123324697 AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. $100 WEILL CORNELL MEDICINE
Apr 28, 2017 121573029 Alteration Type II SIGNED OFF FIRE ALARM MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE HYPERTENSION OFFICES AS INDICATED ON PLANS FILED HEREWITH... $15,000 WEILL MEDICAL COLLEGE OF CORNELL
Apr 5, 2017 120124873 Alteration Type II SIGNED OFF FILING FOR INSTALLATION OF FIRE PUMP IN CELLAR IN THE EXISTING DORMITORY BUILDING AS PER PLANS FILED HEREWITH ONLY. $10,000 WEILL MEDICAL COLLEGE OF CORNELL
May 17, 2016 122754091 Alteration Type III PLAN EXAM - DISAPPROVED FILING NEW FIRE PROTECTION PLAN FOR THE EXISTING LASDON HOUSE BUILDING $1,000 WEILL CORNELL MEDICINE
Apr 11, 2016 140481529 Alteration Type III APPLICATION PROCESSED - ENTIRE FIRE PROTECTION PLAN $1,000 CONSOLIDATED EDISON OF N.Y
Feb 5, 2015 120850828 Alteration Type II SIGNED OFF APPLICATION FILED TO INSTALL 4 NEW ROOF DRAINS AND REPLACE 11 ROOF DRAINS ON 2ND FLOOR ROOF SETBACK. RELOCATE EXISTIN... $65,000 CORNELL UNIVERSITY
Jul 18, 2012 120802514 Alteration Type III SIGNED OFF INSTALLATION A HEAVY DUTY SIDEWALK SHED A TOTAL OF APPROXIMATELY 496 L.F AS PER PLAN AT 420 EAST 70 STREET. DURING RE... $0 CORNELL UNIVERSITY C/O CS BRIDGE
Feb 24, 2012 120731440 Alteration Type II SIGNED OFF LOCAL LAW 11 REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY. PLANS FOR A SIDEWALK SHED... $691,183 WEILL CORNELL MEDICAL COLLEGE
Feb 7, 2011 120544296 Alteration Type II SIGNED OFF REPLACEMENT OF AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. $45,000 WEIL MEDICAL COLLEGE OF CORN
Feb 7, 2011 104190279 Alteration Type III SIGNED OFF To erect 104' ofTemporary Heavy Duty Sidewalk Shed 300 psf for protection for the lifting of a chiller unit up to roo... $0 Weill Medical College/Cornell Un
Nov 19, 2010 103288559 Alteration Type II SIGNED OFF Replace storefront at basement level at existing bookstore. Erect temporary sidewalk fence in conjunction with storef... $50,000 Weill Medical College of Cornell
Nov 19, 2010 103288568 Alteration Type II SIGNED OFF Replace ceiling in conjunction with a.c.installation in lobby as indicated on plans filed herewith only. No change to... $75,000 Weill Medical College of Cornell
Nov 17, 2010 120529393 Alteration Type II PLAN EXAM - DISAPPROVED REPLACEMENT OF AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. $45,000 WEIL MEDICAL COLLEGE OF CORN
Oct 29, 2010 103121113 Alteration Type III SIGNED OFF Filing herewith for installation of heavy duty sidewalk shed 536' long during facade repair. No change to use egress ... $0 Senior Assoc Dean
Aug 3, 2010 120348882 Alteration Type II SIGNED OFF INSTALLATION OF A TEMPORARY TENT ON THE TERRACE FOR A ONE DAY EVENT, MAY 26TH 2010. UPON COMPLETION THE TENT SHALL BE... $3,325 WEILL CORNELL MEDICAL OFFICE
Jul 8, 2010 103618934 Alteration Type III SIGNED OFF Erect 55' of temporary heavy duty sidewalk shed 300 psf in conjunction with work under ALT 103587263. Shed shall comp... $0 Weill Med.College of Cornel Univ
Mar 24, 2010 104583595 Alteration Type II SIGNED OFF INSTALLATION OF INDIVIDUALLY CODED FIREALARM SYSTEM IN EXISTING DORMTRY NO CHANGES $500,000 WEILMEDICAL COLLEGE OF CORNELL
Feb 1, 2010 110397767 Alteration Type II SIGNED OFF INSTALL 1HR FIRE-RATED PARTITIONS AND CEILING ASSEMBLY AT 1ST FLOOR GARAGE. INSTALL NEW MECHANICAL DUCTS CONNECTED TO... $22,000 WEILL CORNELL MEDICAL COLLEGE
Oct 13, 2009 120019112 Alteration Type II SIGNED OFF INSTALL (8) SPRINKLER HEADS AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY. $6,000 WEILL CORNELL MEDICAL COLLEGE
Jul 2, 2009 110331757 Alteration Type II SIGNED OFF PIPING ANCHORAGE AND SUPPORT DETAILS FOR UTILITY RELOCATION.NO CHANGE IN USE, EGRESS OR OCCUPANCY. $10,000 WEILL CORNELL MEDICAL COLLEGE
May 19, 2009 103504628 Alteration Type I PERMIT ISSUED - ENTIRE JOB/WORK FILING TO OBTAIN APPROVAL & C OF O FOR EXISTING 15 STORY NEW BUILDING. ORIGINALLY FILED UNDER NB#86-72 & CONS... $1,000 Weill Med. College of Cornell U.
Oct 22, 2007 104591791 Alteration Type II SIGNED OFF EXTERIOR REPAIRWORK AS PER PLANS FILEDHEREWITH. NOCHANGE IN USE,EGRESS OR OCCUPANCY. PLANS FOR A SIDEWALK SHEDARE BEI... $53,000 WEILL MEDICAL COLLEGE/CORNELL
Jun 30, 2006 104279479 Alteration Type II SIGNED OFF Installation of absorption chillers and cooling towers along with associated piping at roof and MER bulkhead of Lasdo... $1,020,000 WEILL MEDICAL COLLEGE OF CORNELL