East 60 Street, Manhattan
Manhattan • Block 01474 • Lot 0007 • Zip: 10022
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Grand Central 16 min 6 walking, 10 riding
- Union Square 22 min 6 walking, 16 riding
- Times Square 23 min 6 walking, 17 riding
- Fulton Street 29 min 6 walking, 23 riding
- Penn Station 30 min 6 walking, 24 riding
- Downtown Brooklyn 37 min 6 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Lungi
No description yet
Lenox Thai
No description yet
Animo!
Mexican restaurant
Cafe Mandarin
No description yet
P.J. Clarke's
Burgers & other American comfort food in down-to-earth digs with a lively atmosphere.
No Work Allowed
No description yet
Ánimo
No description yet
Jabä
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
2022
2019
-
Alteration Type II
INSTALLATION OF AUTOMATIC HEAT DETECTION FIRE ALARM SYSTEM FOR DELUGE SPRINKLER SYSTEM.
-
Alteration Type II
INSTALLATION OF STEEL SUPPORTS AND GRATING FOR EQUIPMENT PLACMENT ON THE ROOF OF CON EDISONS 60TH STREET GENERATING S...
2018
2017
-
Alteration Type II
MODIFY EXISTING DELUGE SPRINKLER SYSTEM FOR ALTERATION OF THE BUILDING FOR NEW WORK. INSTALL A NEW DELUGE VALVE AND 3...
2016
-
Alteration Type II
FILING FOR ADMINISTRATIVE PURPOSES ONLY. APPLICATION BEING FILED TO ADD FUEL STORAGE WORK TYPE IN CONJUNCTION WITH AP...
-
Alteration Type II
INSTALLATION OF NEW CONCRETE PLATFORM AND FIRE RATED ENCLOSURE FOR A DIESEL DRIVEN TRASH PUMP AND INSTALLATION OF NEW...
2015
-
Alteration Type II
STORM HARDENING MODIFICATIONS AT CON EDISON'S EAST 60 STREET STEAM STATION. WORK TO INCLUDE VARIOUS CONCRETE REPAIRS,...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records