Skip to content

Job filings

340-350 East 88 Street, Manhattan • Block 01550 • Lot 0031

19 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Mar 24, 2026 121188384 Alteration Type I SIGNED OFF RENOVATE AND INSTALL NEW MECHANICAL DUCTWORK AIR CONDITIONING UNITS AND NEW PL UMBING FIXTURES AS SHOWN ON PLANS. SEE... $0 ADVANTAGE TESTING EAST 88TH, LLC
Sep 22, 2025 123385540 Alteration Type II SIGNED OFF DEMOLISH INTERIOR PARTITIONS, CEILINGS AND DOORS THROUGHOUT ALL FLOORS. REMOVE FIXTURES AND CAP PIPING AS SHOWN ON DR... $298,550 ADVANTAGE TESTING EAST 88TH, LLC
Jul 28, 2025 110163386 Alteration Type II SIGNED OFF ALTERATION TO EXISTING APPROVED FIRE ALARM SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. $7,800 CHILDREN'S AID SOCIETY
Dec 9, 2024 121816446 Alteration Type II SIGNED OFF INSTALL ONE SPRINKLER HEAD @ ELEVATOR LOBBY TO ON EXISTING SPRINKLER SYSTEM AT SPECIFIC LOCATION AS DIRECTED BY NYFD ... $1,200 THE CHILDREN S AID SOCIETY
Nov 22, 2024 123374856 Alteration Type II SIGNED OFF REMOVAL OF SPRINKLER HEADS AND PIPING. INSTALL NEW TEMPORARY SPRINKLER LOOP WITH UPRIGHT HEADS AND PIPING AS SHOWN ON... $125,000 ADVANTAGE TESTING EAST 88TH LLC
Oct 30, 2024 123523945 Alteration Type II SIGNED OFF INSTALLATION OF MANUAL, AUTOMATIC SMOKE DETECTION AND AUTOMATIC SPRINKLER ALARM SYSTEM. $50,000 ADVANTAGE TESTING EAST 88TH, LLC
Sep 9, 2024 123474016 Alteration Type II SIGNED OFF REMOVAL AND REPLACEMENT OF SKYLIGHT AND ROOF REPAIR. $227,600 ADVANTAGE TESTING EAST 88TH, LLC
Jan 24, 2024 123469521 Alteration Type II SIGNED OFF INSTALLATION OF NEW SPRINKLER SYSTEM WITH RELATED PIPING. FILED IN CONJUNCTION WITH ALT 1 #121188384. $135,000 ADVANTAGE TESTING EAST 88TH, LLC
Feb 24, 2023 123724336 Alteration Type II SIGNED OFF PARTIAL DEMOLITION ON FLOORS 001-004, CEL, 4MZ, ROOF FILED IN CONJUNCTION WITH ALT 1 #121188384. NO CHANGE IN USE, EG... $1,000 ADVANTAGE TESTING EAST 88TH, LLC
Feb 14, 2023 122851636 Alteration Type II SIGNED OFF FILED HEREWITH DRILLING TEST PITS WORK AS SHOWN ON DRAWINGS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EG... $14,000 ADVANTAGE TESTING EAST 88TH LLC
Jul 7, 2014 102297159 Alteration Type II SIGNED OFF REPLACE LOCHINVAR HOT WATER BOILER WITH TELEDYNE LAARS GAS FIRED HOT WATER HEATER ASSEMBLY MEA#106-00-E AND CONNECT T... $10,000 CHILDRENS AID SOCIETY
May 23, 2013 110113760 Alteration Type III SIGNED OFF ERECT A TOTAL OF 40 LINEAR FEET BY 55 MAXIMUM FEET HIGH TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION ... $0 1695 FIRST AVENUE ASSOCIATES
May 23, 2013 104796678 Alteration Type III SIGNED OFF ERECT A TOTAL OF 50 LINEAR FEET OF HEAVY DUTY SIDEWAK SHED, PER DRAWINGS, RATED FRO 300 LBS/FT2. INSTALLATION SHALL C... $0 356 EAST 89TH REALTY CORP
Feb 26, 2009 110249874 Alteration Type II SIGNED OFF EXTERIOR RESTORATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. $112,875 THE CHIDREN'S AID SOCIETY
Feb 27, 2006 103939357 Alteration Type III SIGNED OFF INSTALL PIPE SCAFFOLD 15 FT LONG BY 50 FT HIGH - AT 350 EAST 88 STREET. DURING REPAIRS. NO CHANGE IN USE EGRESS OR OC... $0 Children Aids Society
Jan 19, 2006 103944065 Alteration Type III SIGNED OFF Install heavy duty sidewalk shed a total of 20 ft long at 350 East 88 Street, - during remedial repairs. Work shall c... $0 Children Aids Society
Jul 7, 2005 104152907 Alteration Type II SIGNED OFF AIR CONDITIONINGT INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. $45,000 THE CHILDREN AID SOCIETY
Apr 4, 2005 103919645 Alteration Type II SIGNED OFF REPLACEMENT COOLING TOWER INSTALLATION. INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. $50,000 CHILDREN AIDS SOCIETY
Dec 12, 2000 102755216 Alteration Type II SIGNED OFF VAULT REPAIRS NO CHANG TO USE, EGRESS OR OCCUPANCY $20,000 CHILDRENS AID SOCIETY