Job filings
311-313 East 89 Street, Manhattan • Block 01552 • Lot 0009
8 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Feb 15, 2022 | 103938090 | Alteration Type II | SIGNED OFF | Interior renovation of existing apartment #2C. Work includes patching, repair and pointing on walls and floor. No cha... | $3,000 | N/A |
| Dec 14, 2016 | 122844164 | Alteration Type II | SIGNED OFF | APPLICATION FILED FOR COMBINING TO APARTMENT 3 A AND 3 G (NO CHANGE IN USE EGRESS, OR OCCUPANCY) | $51,000 | 313 E 89TH STREET CORP. |
| Aug 27, 2015 | 122034690 | Alteration Type II | SIGNED OFF | PAA IS BEING FILED TO CORRECT PW1 SECTION 22 SHOWING THE SCOPE OF WORK DOES NOT REQUIRE ASBESTOS ABATEMENT. | $175,000 | MAUNTER GLICK CORP. |
| Feb 26, 2015 | 140227573 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY... | $0 | B H & B CONSTRUCTION INC. |
| Feb 26, 2015 | 140228215 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER ... | $0 | B H & B CONSTRUCTION INC. |
| Jul 18, 2014 | 140228224 | Alteration Type III | PLAN EXAM - IN PROCESS | PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER ... | $0 | B H & B CONSTRUCTION INC. |
| May 27, 2014 | 110236085 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 50 LINEAR FEET BY 55 FEET MAXIMUM HIGH TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION ... | $0 | 313-321 EAST 89TH STREET CORP |
| Feb 8, 2012 | 104863701 | Alteration Type II | SIGNED OFF | REPAIR MASONRY WALLS AND LINTELS AS NOTED ON THE ATTACHED DRAWINGS. IF SIDEWALK SHED REQUIRED WILL BE FILED UNDER SEP... | $75,000 | 313-321 EAST 89TH STREET CORP. |