DOB violations
303 East 93 Street, Manhattan • Block 01556 • Lot 0005
5 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 30, 2023 | 29246 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Feb 2, 2026 |
| Nov 8, 2019 | 00871 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Dec 3, 2019 |
| Apr 6, 2018 | 01345 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Dec 3, 2019 |
| Oct 12, 2017 | FEU10801FF | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FTM BLDG IN SAFE COND.WINDOWS FACING REAR OF BLDG LOC ALONG LINE B OF APTS THERE ARE DIAGONAL CRACKING AT WALL FRAMIN... | — |
| Oct 10, 2017 | CER01DF | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE SUSTAI NED TO APTS 2B &3B DUE TO COLLAPSE CEILINGS PR... | — |