Job filings
508-512 East 84 Street, Manhattan • Block 01580 • Lot 0043
23 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| May 5, 2021 | 140942728 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION ON APT 3EA ON 3RD FLOOR AS PER PLANS FILED HEREWITH. RELATED PLUMBING APPLICATION FILED SEPARATEL... | $85,000 | N/A |
| Mar 23, 2020 | 123755944 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION OF EXISTING 2ND FLOOR APARTMENT 2B, WORK INCLUDES REMOVAL & INSTALLATION OF NON-LOAD-BEARING ... | $100,000 | N/A |
| Jan 15, 2020 | 123880764 | Alteration Type II | SIGNED OFF | RESPECTFULLY REQUEST TO FILE FOR COMBINATION OF APARTMENTS 3E & 3A. PROPOSED OPENING IS IN NON LOADING BEARING PA... | $5,000 | HENRY J.STERN REVOCABLE TRUST |
| Dec 1, 2017 | 123099271 | Alteration Type II | SIGNED OFF | RENOVATION TO AN EXISTING APARTMENT ON THE SECOND FLOOR. ARCHITECTURAL AND PLUMBING WORK TYPES. NO CHANGE TO USE, OCC... | $11,500 | NA |
| Jul 11, 2017 | 122803671 | Alteration Type II | SIGNED OFF | FORMALLY FILING ALTERATION TYPE II FOR INTERIOR RENOVATION WORK IN UNIT 2D INCLUDING PLUMBING WORK. NO CHANGE IN USE,... | $80,000 | 510 E. 84TH ST. OWNERS CORP. |
| Feb 3, 2017 | 122435310 | Alteration Type II | SIGNED OFF | INTERIOR ALTERATION TO UNIT 1C, INCLUDING PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $25,000 | 510 E. 84TH ST. OWNERS CORP. |
| Jul 16, 2015 | 122262158 | Alteration Type II | SIGNED OFF | FACADE REPAIRS, REMOVE AND PATCH LOOSE STUCCO, CUT AND POINT BRICK, REPLACE WINDOW, REPLACE LINTELS, APPLY PAINT, ALL... | $30,180 | 510 EAST 84TH STREET CORP |
| Jul 16, 2015 | 120827356 | Alteration Type II | SIGNED OFF | RENOVATION TO EXISTING BUILDING, REPLACE ROOF, REMOVE INTERIOR LOW BRICK PARAPHETS, REPAIR PARAPHET, SCRAPE AND PAINT... | $99,760 | 510 EAST 84TH STREET CORP. |
| Jun 16, 2015 | 140315656 | Alteration Type III | SIGNED OFF | INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EG... | $0 | CEPRINE SCAFFOLDING |
| Jun 16, 2015 | 140316101 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE... | $0 | CEPRINE SCAFFOLDING |
| Jan 4, 2013 | 121382280 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | ALTERATION OF 3 EXISTING BATHROOMS AS PER PLANS. REPLACE EXISTING BATHROOM FIXTURES AND INSTALL 2 NEW STALL SHOWERS. ... | $45,000 | 510 E. 84TH ST. OWNERS CORP. |
| Apr 10, 2012 | 104081048 | Alteration Type II | SIGNED OFF | INSTALL NEW AO SMITH DW720 HOT WATER 720,000 BTU MEA 96-77E AND NEW 120 GALLON STORAGE TANK ALL WORK DONE UNDER DOB#1... | $10,000 | 510 E 84 ST CORP |
| Sep 26, 2011 | 120834990 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF 25 L.F HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W... | $0 | 510 E 84 ST OWNERS CORP |
| Sep 26, 2011 | 120835962 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHNAG... | $0 | 510 E 84 ST OWNERS CORP |
| May 25, 2011 | 120591984 | Alteration Type II | SIGNED OFF | HEREWITH FILE TO RENOVATE APT. 4C. GENERAL CONSTRUCTION TO INCLUDE WALL REPAIRS, REPAIR, SAND AND FINISH HARDWOOD FLO... | $33,960 | 510 EAST 84 STREET CORP. |
| May 23, 2011 | 120591975 | Alteration Type II | SIGNED OFF | HEREWITH FILE PLANS TO RENOVATE APT. 5C. GENERAL CONSTRUCTION TO INCLUDE WALL REPAIRS (PLASTER CEILING AND WALLS), LE... | $23,720 | 510 EAST 84 STREET CORP. |
| Sep 7, 2010 | 120374077 | Alteration Type II | SIGNED OFF | HEREWITH FILE TO RENOVATE APT. 3C. WORK TO INCLUDE MINOR INTERIOR DEMOLITION AND ERECTION OF A NEW PARTITION WALL AND... | $6,700 | 510 E. 84 STREET CORP. |
| Jan 19, 2010 | 110370973 | Alteration Type II | SIGNED OFF | REPLACE BOILER & OIL BURNER. INSTALL A HB SMITH 28A-8-S WITH A CARLIN 801 CRD. NO CHANGE IN EGRESS USE OR OCCUPAN... | $0 | 510 E. 84 ST CORP C/O PALEY MGMT |
| Dec 15, 2009 | 110340499 | Alteration Type II | SIGNED OFF | INSTALL (1) 1500 GALLON OIL TANK WRAPPED IN A 3HR FP JACKET. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER T... | $17,000 | 510 E 84 ST CORP C/O PALEY MGMT |
| Sep 28, 2009 | 104153657 | Alteration Type II | SIGNED OFF | — | $55,000 | 510 East 84th Street Corp. |
| Jul 28, 2009 | 103710566 | Alteration Type II | SIGNED OFF | Interior renovation and combination of 3 existing apartments: 5A, 5E, and 4E. Architectural, structural, plumbing, an... | $60,000 | 510 East 84th St. Corp. |
| Nov 1, 2005 | 104284926 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Structural work filed herewith as per plans, in conjunction with application #104153657. No change in use, egress or ... | $7,500 | 510 East 84th Street Corp. |
| Jul 21, 2004 | 103392874 | Alteration Type II | SIGNED OFF | VERTICAL APARTMENT COMBINATION TO INCLUDE THE REMOVAL OF KITCHEN IN APARTMENT 3B AND THE INSTALLATION OF AN ACCESSORY... | $16,200 | 510 EAST 84TH ST CORP. |