DOB violations
Taft Houses, Manhattan • Block 01618 • Lot 0001
112 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 00185 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | — |
| Nov 14, 2025 | 00984 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | — |
| May 13, 2025 | SR1101RF | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,OBSERVED ON EXP3 NORTH ELEV A... | — |
| Sep 23, 2024 | 00208 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | — |
| Sep 23, 2024 | 01051 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 05286 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Jun 30, 2023 | 05290 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Aug 12, 2024 |
| Jun 30, 2023 | 00555 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 25049 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Jun 30, 2023 | 05288 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Aug 12, 2024 |
| Jun 30, 2023 | 05289 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Dec 20, 2024 |
| Jun 30, 2023 | 25048 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Jun 30, 2023 | 02925 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 25046 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jul 1, 2024 |
| Jun 30, 2023 | 05287 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Aug 12, 2024 |
| Jun 30, 2023 | 04057 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 25047 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Jun 30, 2023 | 01708 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 05285 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Jun 20, 2023 | 01805 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 05279 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Jun 20, 2023 | 04170 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 03027 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 00595 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 26779 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Apr 25, 2023 | 00050 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01198 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 03659 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | Jul 1, 2024 |
| Apr 25, 2023 | 05637 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Apr 25, 2023 | 03661 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Apr 25, 2023 | 03660 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | Jul 5, 2024 |
| Feb 22, 2023 | 02114 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 02115 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 02112 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 02116 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 02119 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Dec 17, 2021 | 00987 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 29, 2024 |
| Dec 17, 2021 | 00986 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | Jun 14, 2024 |
| Dec 17, 2021 | 00985 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 17, 2023 |
| Dec 17, 2021 | 00983 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 29, 2024 |
| Dec 17, 2021 | 00988 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | Jun 14, 2024 |
| Dec 17, 2021 | 00984 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 28, 2024 |
| Mar 16, 2020 | 00059 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00050 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Dec 4, 2019 | HAZ88492 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Nov 20, 2019 | HAZ88463 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Nov 20, 2019 | HAZ88465 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Nov 19, 2019 | HAZ88462 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Nov 19, 2019 | HAZ88461 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Sep 6, 2019 | 00127 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Nov 19, 2019 |