171 East 101 Street, Manhattan
Manhattan • Block 01629 • Lot 0025 • Zip: 10029
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 19 min 4 walking, 15 riding
- Union Square 23 min 4 walking, 19 riding
- Times Square 25 min 4 walking, 21 riding
- Fulton Street 29 min 4 walking, 25 riding
- Penn Station 33 min 4 walking, 29 riding
- Downtown Brooklyn 36 min 4 walking, 32 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Dalila’s Peruvian Bistro
No description yet
Soledad
No description yet
Café D'Anvers
No description yet
Ollin
No description yet
Black Rican Vegan
Black Rican Vegan is a cozy restaurant in the heart of East Harlem, offering a unique fusion of Puerto Rican and Afro...
Gaudir
No description yet
Abuelita’s Desserts
No description yet
Bangklyn East Harlem
Bangklyn East Harlem is a trendy and vibrant restaurant located in the heart of East Harlem. Serving up delicious Tha...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Oct 14, 2025
Class A
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR...
-
HPD violation Jun 4, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Jun 5, 2023
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCA...
-
HPD violation Apr 24, 2023
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT WINDOW ...
-
HPD violation Mar 2, 2023
Class A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT WINDOW ...
-
HPD violation Feb 23, 2023
Class B
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON DOOR OF ROOM LEADING...
2021
-
CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG WALLS & APPURTENANCES.AS NOTED:AT TIME OF INSPECTION I OBSERVED ON EXPOSURE #1 SOUT...
2019
-
Alteration Type II
SCOPE OF WORK WILL BE NEW INTERIOR NON-BEARING PARTITIONS AT EXISTING CELLAR. NO CHANGE IN EGRESS, USE OR OCCUPANCY
2018
2017
-
Alteration Type II
SCOPE OF WORK WILL BE INTERIOR RENOVATION INCLUDING DEMOLITION AND INSTALLATION OF PARTITIONS, FLOORING FINISHES AND ...
-
Alteration Type II
SCOPE OF WORK WILL BE INTERIOR RENOVATION INCLUDING DEMOLITION AND INSTALLATION OF PARTITIONS, FLOORING FINISHES AND ...
-
CLASS - 2
FAILURE TO MAINTAIN BLDG FACADE AND APPURTENANCES AS NOTED: EXP1 MISS ING MORTAR JOINTS, A/C HAS OBJECT ON TOP, CRACK...
-
Alteration Type II
SCOPE OF WORK WILL BE INTERIOR RENOVATION, DEMOLITION AND INSTALLATION OF PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR ...
2016
2009
2005
-
Non-Hazardous
FAILURE TO SUBMIT A 5TH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY L...
2004
-
Non-Hazardous
FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT : PERIODIC INSPECTIONOF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED...
2003
-
DOB violation Mar 19, 2003
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2002
-
DOB violation Aug 8, 2002
L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
-
DOB violation Mar 26, 2002
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
Hazardous
FAILURE TO MAINTAIN EXTERIOR OF BUILDING.LOOSE FLOWER POTS ON WINDOW LEDGE ON 2ND FLOOR.IMPROPERLY INSTALLED AC UNITS...
2001
-
DOB violation Feb 27, 2001
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2000
-
DOB violation Feb 7, 2000
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1999
-
DOB violation Mar 16, 1999
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1988
-
Hazardous
FAILURE TO PROVIDE ADEQUATE PROTECTION FOR SIDEWALKS AND DURING CONSTRUCTION OPERATIONS. REMEDY: OBTAIN ALL NECESSARY...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records