Skip to content

Job filings

327 East 105 Street, Manhattan • Block 01677 • Lot 0014

11 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Sep 10, 2019 123817815 Alteration Type II PLAN EXAM - APPROVED HEREWITH FILED APPLICATION FOR EXTERIOR FACADE RESTORATION AS PER PLANS $200,000 C/O HOPE COMMUNITY INC
Mar 9, 2017 122790667 Alteration Type III SIGNED OFF MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. REPLACEMENT OF ANTENNAS WITH RELATED RRH UNITS ON THE ROOF. ALL IN ... $3,300 HOPE COMMUNITY, INC.
Oct 20, 2016 104201392 Alteration Type II SIGNED OFF REPLACE (2) HOT WATER BOILERS (NYC BOILER NO. MD70284-06, 07) NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLIC... $48,000 CARLAS RIOS SENIOR RESIDENCE
Jun 21, 2016 122555635 Alteration Type III SIGNED OFF MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE, REPLACEMENT OF ANTENNAS WITH RELATED RRH UNITS ON THE ROOF. ALL WOR... $3,300 HOPE COMMUNITY, INC.
Aug 7, 2014 120539097 Alteration Type III SIGNED OFF INSTALLATION OF ADDITIONAL TELECOMMUNICATIONS CABINET ON EXISTING DUNNAGE ON R OOF. INSTALLATION OF RELATED ANTENNAS ... $25,000 HOPE COMMUNITY
Aug 28, 2012 120102030 Alteration Type III SIGNED OFF INSTALLATION OF APPROXIMATELY 175 L.F. OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED IS DESINED FOR A LIVE LOAD OF 3... $0 VERTICAL SCAFFOLD LLC
Aug 16, 2012 110463800 Alteration Type II SIGNED OFF PERFORM LOCAL LAW 11 REPAIR INCLUDING GENERAL MASONRY. RESTORATION TO EXTERIOR FACADE. NO CHANGE IN USE, EGRESS OR OC... $150,000 HOPE COMMUNITY
Oct 20, 2011 120864886 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK CONSTRUCTION OF NEW RETAINING WALL AT SIDE AND REAR YARD. DRAIN PIPE TO BE REMOVE AND REPLACE.STEEL FENCE & GATE ... $27,825 HOPE COMMUNITY INC.
Jun 15, 2011 120381434 Alteration Type III SIGNED OFF INSTALLING 2'X2' TELECOMMUNICATIONS EQUIPMENT CABINET ON EXISTING STEEL PLATFO RM ON ROOF IN CONFORMANCE WITH TPPN# 5... $2,000 HOPE COMMUNITY INC
Jun 20, 2006 104308848 Alteration Type III SIGNED OFF INSTALLATION OF ADDITIONAL TELECOMMUNICATION CABINETS ON ROOF WITH RELATED DUNNAGE. RELATED ANTENNAS ONROOF. INITIAL ... $25,000 HOPE COMMUNITY INC.
Jan 24, 2003 103171345 Alteration Type II SIGNED OFF INSTALLATION OF TELECOMMUNICATION CABINE TS ON DUNNAGE PLATFORM & RELATE ANTENNAS ON ROOF ALL WORK IN COMPLIANCE ... $25,000 HOPE COMMUNITY INC