DOB violations
East 112 Street, Manhattan • Block 01684 • Lot 0001
148 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 23, 2024 | 01020 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | Oct 28, 2024 |
| Apr 22, 2023 | 00093 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) | May 12, 2023 |
| Aug 21, 2022 | 00891 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) | May 12, 2023 |
| Feb 22, 2022 | 00574 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Mar 18, 2026 |
| Feb 22, 2022 | 00568 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Mar 18, 2026 |
| Feb 22, 2022 | 00576 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Feb 13, 2026 |
| Feb 22, 2022 | 00572 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Feb 12, 2026 |
| Feb 22, 2022 | 00577 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Mar 18, 2026 |
| Feb 22, 2022 | 00570 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Mar 18, 2026 |
| Feb 22, 2022 | 00569 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Sep 5, 2025 |
| Feb 22, 2022 | 00573 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Feb 22, 2022 | 00575 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Sep 5, 2025 |
| Feb 22, 2022 | 00571 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Mar 18, 2026 |
| Jun 29, 2020 | 00244 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) | Aug 6, 2021 |
| Sep 6, 2019 | 00138 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Dec 13, 2019 |
| Sep 6, 2019 | 00134 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Dec 13, 2019 |
| Sep 6, 2019 | 00136 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Nov 19, 2019 |
| Sep 6, 2019 | 00137 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Nov 19, 2019 |
| Sep 6, 2019 | 00139 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Jun 19, 2020 |
| Sep 6, 2019 | 00135 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Dec 13, 2019 |
| Sep 6, 2019 | 00141 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Dec 13, 2019 |
| Sep 6, 2019 | 00140 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST | Dec 13, 2019 |
| May 31, 2018 | 20200 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Sep 20, 2019 |
| May 31, 2018 | 20090 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Jan 10, 2020 |
| May 31, 2018 | 20201 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Jan 3, 2020 |
| May 31, 2018 | 20088 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Sep 20, 2019 |
| May 31, 2018 | 20089 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Sep 20, 2019 |
| May 31, 2018 | 20087 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Dec 9, 2019 |
| May 31, 2018 | 20270 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Dec 4, 2019 |
| May 31, 2018 | 20271 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Dec 3, 2019 |
| Mar 27, 2018 | 00352 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017) | Apr 3, 2018 |
| Feb 16, 2017 | 10261 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016) | Feb 16, 2017 |
| Jan 3, 2017 | 00680 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Apr 11, 2017 |
| Jan 3, 2017 | 00553 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jul 3, 2017 |
| Jan 3, 2017 | 00679 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 27, 2017 |
| Jan 3, 2017 | 00681 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Apr 11, 2017 |
| Jan 3, 2017 | 00682 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Apr 24, 2017 |
| Jan 3, 2017 | 00678 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 27, 2017 |
| Jun 1, 2016 | 00083 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | Mar 25, 2019 |
| Jun 1, 2016 | 30046 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS(2015) | Jun 28, 2017 |
| Jan 27, 2016 | HAZ85984 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jan 26, 2017 |
| Jan 27, 2016 | HAZ85975 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jan 26, 2017 |
| Dec 31, 2014 | 00089 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN ENERGY EFFICIENCY REPORT IN 2014 PER AD. CODE SEC. 28-308.4 | Jun 28, 2017 |
| May 15, 2014 | 21167 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jun 4, 2015 |
| May 15, 2014 | 21166 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jun 4, 2015 |
| May 15, 2014 | 21165 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jun 4, 2015 |
| May 15, 2014 | 21164 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jun 4, 2015 |
| May 15, 2014 | 21163 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jun 4, 2015 |
| Nov 1, 2013 | HAZ75362 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V-DOB VIOLATION - ACTIVE | — | — |
| Oct 24, 2013 | HAZ74622 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jun 21, 2016 |