Job filings
23-29 West 122 Street, Manhattan • Block 01721 • Lot 0001
4 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Mar 17, 2020 | 120941428 | Alteration Type I | SIGNED OFF | MAKE MINOR CHANGES TO THE EXISTING SPRINKLER SYSTEM. INSTALL HVAC UNITS THROUGH OUT. | $0 | N/A |
| Jan 24, 2018 | 140660238 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING... | $0 | J & G CONSTRUCTION SRVCS |
| Jan 24, 2018 | 140660693 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL CO... | $0 | J & G CONSTRUCTION SRVCS |
| Dec 14, 2012 | 120929898 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION FROM 1ST TO 4TH FLOOR. IN CONJUNCTION WITH THE ALTERATION I, NO CHANGES IN USE, OCCUPANCY OR MEAN... | $60,000 | N/A |