173 East 120 Street, Manhattan
Manhattan • Block 01769 • Lot 0032 • Zip: 10035
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 19 min 4 walking, 15 riding
- Union Square 23 min 4 walking, 19 riding
- Times Square 25 min 4 walking, 21 riding
- Fulton Street 29 min 4 walking, 25 riding
- Penn Station 33 min 4 walking, 29 riding
- Downtown Brooklyn 36 min 4 walking, 32 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Taco Mix
No description yet
Sylla
Sylla is a cozy neighborhood restaurant in Harlem, offering a fusion of Mediterranean and African cuisine. Enjoy fres...
Sam's Famous Pizza
No description yet
Accra Express
Accra Express offers authentic Ghanaian cuisine in the heart of Harlem. Enjoy flavorful dishes like jollof rice and b...
Mama T
No description yet
The Good Good
No description yet
A Taste of Seafood
No description yet
Uptown Veg
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.DEFECT NOTED EXTERIOR BRICK FACADE HAS 1 BRICK SPALLING/PULLING A...
-
DOB violation Apr 20, 2023
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
.INSTALL A SIDEWALK SHED 24 FEET AT THE FRONT OF THE BUILDING PLUS 5 FEET ON EACH SIDE
2015
-
DOB violation Mar 3, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2013
-
DOB violation Nov 19, 2013
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2012
-
DOB violation May 17, 2012
E-ELEVATOR ELEVATORREQUIRED
2007
-
Alteration Type I
CONVERSION OF EXISTING WAREHOUSE INTO ON E OFFICE SPACE AND TWO (2) DW UNITS AS PER PLAN.
-
DOB violation Apr 2, 2007
LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
-
Alteration Type II
Propposed Mechinical for HVAC and Ventilation for Bath and Kitchens. No change of use egress or occupancy
-
Alteration Type II
sprinkler application is filed for 30 Heads off the domestic line. No change in use egress or occupancy.
-
Alteration Type II
Proposed boiler inconjunction with ApÝplication 103630518 . No change in use egress or occupancy
2006
2005
2002
-
Alteration Type II
VARIOUS ARCHITECTURAL AND PLUMBING CHANGES THROUGHOUT BUILDING AS PER ATTACHED PLANS. NO CHANGE IN USE, EGRESS OR OCC...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records