Job filings
619-623 West 113 Street, Manhattan • Block 01895 • Lot 0045
7 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jun 25, 2014 | 120876702 | Alteration Type I | SIGNED OFF | INTERIOR PARTITIONS AND RELATED FINISHES RENOVATION THROUGHOUT. INSTALL ELEVATOR SHAFT, ELEVATOR TO BE FILED BY OTHER... | $1,500,000 | COLUMBIA UNIVERSITY, CAPITAL PRO |
| Jan 28, 2014 | 121360213 | Alteration Type II | SIGNED OFF | INSTALLATION OF BOILER AS PER PLANS FILED HEREWITH. | $30,000 | COLUMBIA UNIVERSITY,CAPITAL PROJ |
| Oct 15, 2013 | 120876711 | Alteration Type II | SIGNED OFF | SPRINKLER MODIFICATIONS FOR RENOVATION THROUGHOUT AS PER PLANS FILED HEREWITH. | $245,000 | COLUMBIA UNIVERSITY, CAPITAL PRO |
| Oct 7, 2013 | 120876695 | Alteration Type II | SIGNED OFF | INSTALLATION OF MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER ALARM SYSTEM. | $43,000 | COLUMBIA UNIVERSITY, CAPITAL PRO |
| Aug 21, 2013 | 121135976 | Alteration Type III | SIGNED OFF | INSTALLATION OF SCAFFOLD ON THE EXISTING SIDEWALK SHED (FILED SEPARATELY) AS PER PLANS DURING REMEDIAL REPAIRS. NO CH... | $0 | COLUMBIA UNIVERSITY, CAPITAL PRO |
| Aug 1, 2013 | 121140461 | Alteration Type III | SIGNED OFF | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 75' LONG AS PER PLANS DURING REMEDIAL REPAIRS. NO CHANGE IN ... | $0 | COLUMBIA UNIVERSITY, CAPITAL PRO |
| Aug 1, 2013 | 121138072 | Alteration Type III | SIGNED OFF | INSTALLATION OF A PLYWOOD FENCE 8' HIGH AS PER PLANS DURING REMEDIAL REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ... | $0 | COLUMBIA UNIVERSITY, CAPITAL PRO |