Skip to content

Job filings

633 West 115 Street, Manhattan • Block 01896 • Lot 0052

21 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Sep 26, 2024 121583553 New Building SIGNED OFF FILING HEREWITH FOUNDATION AND STRUCTURAL AS SHOWN ON DRAWINGS FILED HEREWITH. $0 KOREAN METHODIST CHURCH & INSTIT
Jun 18, 2024 121705636 Alteration Type III SIGNED OFF FILE BUILDERS PAVEMENT PLAN AS SHOWN AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB# 121583553. $0 KOREAN METHODIST CHURCH & INSTIT
Jan 17, 2024 121591615 Place of Assembly COMPLETED $0 KOREN METHODIST CHURCH & INSTIT.
Jan 24, 2023 123136356 Alteration Type III SIGNED OFF INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUP... $0 REPUBLIC SCAFFOLD & HOIST
Oct 18, 2022 140998838 Alteration Type III SIGNED OFF INTERIOR RENOVATION OF STORE : INSTALLATION OF NON-BEARING PARTI. WALLS, NEW FLOOR & CEILING FINISH & CARPENT... $50,000 KOREAN METHODIST CHURCH & INSTIT
Jun 24, 2022 123410399 Alteration Type II SIGNED OFF STRUCTURAL TEMPORARY SHORING FRONT FACADE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $12,000 KOREAN METHODIST CHURCH & INSTIT
Jun 21, 2022 123810625 Alteration Type II SIGNED OFF INSTALLATION OF MINI CRANE IN CONJUNCTION WITH NB 121583553. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR... $0 KOREAN METHODIST CHURCH
Jun 14, 2022 121640643 Alteration Type II SIGNED OFF FILING FOR A MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM. IN CONJUNCTION WITH NB#12... $1,000 KOREAN METHODIST CHURCH & INSTIT
Jan 11, 2022 123136347 Alteration Type III SIGNED OFF INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 155'LONG AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE... $0 REPUBLIC SCAFFOLD & HOIST
Feb 12, 2021 140998589 Alteration Type III PLAN EXAM - IN PROCESS INTERIOR RENOVATION OF STORE : INSTALLATION OF NON-BEARING PARTI. WALLS, NEW FLOOR & CEILING FINISH & CARPENT... $100,000 KOREAN METHODIST CHURCH & INSTIT
Feb 11, 2021 140998516 Alteration Type III PLAN EXAM - IN PROCESS INTERIOR RENOVATION OF STORE : INSTALLATION OF NON-BEARING PARTI. WALLS, NEW FLOOR & CEILING FINISH & CARPENT... $200,000 KOREAN METHODIST CHURCH & INSTIT
Mar 15, 2019 123410406 Alteration Type II PLAN EXAM - DISAPPROVED SUPPORT OF EXCAVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $10,000 KOREAN METHODIST CHURCH & INSTIT
Sep 12, 2018 122620468 Demolition SIGNED OFF $0 KOREAN METHODIST CHURCH & INSTIT
Mar 20, 2018 121240273 Alteration Type II SIGNED OFF STRUCTURAL TEMPORARY SHORING FRONT FACADE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $25,000 KOREAN METHODIST CHURCH & INSTIT
Mar 1, 2016 122687459 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK $25,000 KOREAN METHODIST CHURCH & INSTIT
Dec 21, 2015 122641695 Alteration Type II PLAN EXAM - APPROVED SUPPORT OF EXCAVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $10,000 KOREAN METHODIST CHURCH & INSTIT
Dec 16, 2015 140441289 Alteration Type II APPLICATION PROCESSED - ENTIRE SUPPORT OF EXCAVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $10,000 KOREAN METHODIST CHURCH & INSTIT
Nov 4, 2015 122571476 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INTERIOR DEMOLITION, REMOVAL OF PARTITIONS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $30,000 KOREAN METHODIST CHURCH & INSTIT
Mar 25, 2014 121688469 Alteration Type II PLAN EXAM - APPROVED INSTALL SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY... $1,000 KOREAN METHODIST CHURCH & INSTIT
Jan 5, 2010 120084513 New Building PLAN EXAM - APPROVED INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNIT. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING. $0 KOREAN METHODIST CHURCH & INSTIT
Jan 5, 2002 103045955 Alteration Type I PLAN EXAM - IN PROCESS PROPOSE TO ENLARGE EXISTING CHURCH AS SH OWN ON PLANS. INSTALL TEMPORARY CONSTRUCTION SHED DURING CONST RUCTION. $500,000 THE KOREAN METHODIST CHURCH & I