Barnard Coll Brinckerhoff Hall, Manhattan • Block 01989 • Lot 0050
24 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| May 8, 2023 | 104818360 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF 200 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY... | $0 | ARSENAL SCAFFOLD INC. |
| Sep 8, 2021 | 122992495 | Alteration Type III | SIGNED OFF | SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | SPRING SCAFFOLDING LLC |
| Aug 13, 2021 | 121806634 | Alteration Type II | SIGNED OFF | FILING FOR FACADE AND ROOF REPAIRS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1,500,000 | BARNARD COLLEGE |
| Aug 12, 2021 | 123143883 | Alteration Type II | SIGNED OFF | ROOF REPLACEMENT AND RELATED FINISHES AS PER PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER T... | $230,000 | BARNARD COLLEGE |
| Jun 29, 2021 | 123110659 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33.... | $0 | BARNARD COLLEGE |
| Jun 14, 2021 | 140973588 | Alteration Type II | SIGNED OFF | MECHANICAL WORK AS PER PLANS, NO CHANGE TO USE OR EGRESS. | $33,000 | BARNARD COLLGE |
| Jun 3, 2021 | 140935264 | Alteration Type II | SIGNED OFF | ALTERATIONS TO 1ST FLOOR LOBBY, CLOSET, AND BACKSTAGE FOR NEW ACCESSIBLE PLATFORM LIFT. NO CHANGE TO USE, EGRESS, OR ... | $217,400 | BARNARD |
| May 21, 2021 | 140944664 | Alteration Type II | SIGNED OFF | FILING HEREWITH OT WORK FOR INTERIOR RENOVATION AT MILBANK HALL AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY | $100,000 | BARNARD COLLGE |
| Aug 4, 2020 | 140935040 | Alteration Type II | PLAN EXAM - IN PROCESS | ALTERATIONS TO 1ST FLOOR LOBBY, CLOSET, AND BACKSTAGE FOR NEW ACCESSIBLE PLATFORM LIFT. NO CHANGE TO USE, EGRESS, OR ... | $217,400 | BARNARD |
| May 4, 2020 | 140899883 | Alteration Type II | PLAN EXAM - IN PROCESS | ALTERATIONS TO 1ST FLOOR LOBBY, CLOSET, AND BACKSTAGE FOR NEW ACCESSIBLE PLATFORM LIFT. NO CHANGE TO USE, EGRESS, OR ... | $217,400 | BARNARD |
| May 1, 2020 | 140899589 | Alteration Type II | PLAN EXAM - IN PROCESS | FILING HEREWITH FOR WORK ASSOCIATED WITH NEW ACCESSORY PLATFORM. NO CHANGE TO USE EGRESS OR OCCUPANCY | $217,400 | BARNARD |
| Jan 31, 2020 | 122435427 | Alteration Type III | SIGNED OFF | MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. REPLACEMENT OF ANTENNAS WITH RELATED RRH UNITS ON THE ROOF. ALL IN ... | $4,400 | BARNARD COLLEGE |
| Jan 24, 2020 | 122944591 | Alteration Type III | SIGNED OFF | REPLACEMENT OF EXISTING TELECOMMUNICATIONS ANTENNAS AND RRH UNITS ON ROOF. INSTALLATION OF RRH UNITS ON EXISTING EQUI... | $20,000 | BARNARD COLLEGE |
| May 21, 2018 | 123351309 | Alteration Type III | SIGNED OFF | OBTAIN EUP'S FOR TWO HVAC UNITS. . (1) TRANE 7.5 TON PACKAGED COOLING UNIT MODEL #: TSC090F4E0A & (1) DAIKIN 30 T... | $93,750 | BARNARD COLLEGE |
| Oct 6, 2016 | 122282074 | Alteration Type III | SIGNED OFF | INSTALLATION OF RRU UNITS ON TO A EXISTING TELECOMMUNICATION SITE ON THE ROOF. INSTALLATION OF ACCESS LADDER, ACCESS ... | $15,000 | BARNARD COLLEGE |
| Jul 2, 2015 | 140214042 | Alteration Type III | SIGNED OFF | SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APP... | $0 | SPRING SCAFFOLDING LLC |
| Nov 3, 2014 | 140214079 | Alteration Type III | SIGNED OFF | PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APP... | $0 | SPRING SCAFFOLDING LLC |
| May 23, 2012 | 120801711 | Alteration Type II | SIGNED OFF | HEREWITH FILE PLANS FOR THE INSTALALTION OF RPZ BFP DEVICES & ASSOCIATED PIPING. | $25,000 | BARNARD COLLEGE |
| Apr 12, 2011 | 120558672 | Alteration Type II | SIGNED OFF | HEREWITH FILING TO RECORD EXISTING HVAC UNITS IN ORDER TO OBTAIN EQUIPMENT USE PERMITS. NO CHANGE, TO USE EGRESS OR O... | $43,000 | BARNARD COLLEGE |
| Nov 29, 2010 | 120384823 | Alteration Type III | SIGNED OFF | INSTALLING 2'X2' TELECOMMUNICATIONS EQUIPMENT CABINET ON EXISTING STEEL PLATFO RM ON ROOF IN CONFORMANCE WITH TPPN# 5... | $2,000 | BARNARD COLLEGE |
| Dec 21, 2007 | 104818486 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF 200 FEET X 19 FEET HIGH PIPE SCAFFOLD FOR REMEDIAL REPAIRS. SCAFFOLD SHALL ORIGINATE FROM SIDEWALK SH... | $0 | ARSENAL SCAFFOLD INC. |
| Dec 21, 2007 | 104818495 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED INSTALLATION OF 200 FEET LONG X 2 FEET WIDE X 8 FEET HIGH PLYWOOD FENCE AT INNER LEGS OF SIDEWALK SHED. NO C... | $0 | ARSENAL SCAFFOLD INC. |
| Dec 12, 2007 | 110065152 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF 200 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY TO LL 33... | $0 | ARSENAL SCAFFOLD INC |
| May 16, 2006 | 104340802 | Alteration Type III | SIGNED OFF | INSTALLATION OF TELECOMMUNICATION CABINETS ON ROOF WITH RELATED ANTENNAS ON ROOF. ALL WORK IN CONFORMANCE WITH TPPN 5... | $25,000 | BARNARD COLLEGE |