DOB violations
3165-3167 Broadway, Manhattan • Block 01993 • Lot 0094
28 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 00181 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | — |
| Nov 14, 2025 | 00979 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | — |
| Feb 20, 2025 | 912046 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | CYCLE 9C UNSAFE REPORT FILED | — |
| Sep 23, 2024 | 01046 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | — |
| Sep 23, 2024 | 00198 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | — |
| Feb 22, 2024 | 00427 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | — |
| Jun 30, 2023 | 04242 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 00754 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 01907 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 03111 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 04374 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 00821 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 02031 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 03232 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00034 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01184 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Mar 16, 2020 | 00039 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00039 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Jun 22, 2018 | 00017 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Sep 27, 2018 |
| Jun 23, 2017 | 00026 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Sep 27, 2018 |
| Dec 16, 2016 | 00009 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | Jan 17, 2017 |
| Feb 11, 2016 | RW0911WW | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | FM STRUCTURE IN A CODE COMPLIANT MANNER. AT REAR YARD, PROPERTY LINE RETAINING WALL IS CRACKED AND OUT OF PLUMB. REME... | Jul 10, 2018 |
| Mar 3, 2015 | 00029 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Jan 17, 2017 |
| May 15, 2014 | 06563 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Oct 15, 2014 |
| Aug 8, 2002 | NRF51840 | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jan 29, 2003 |
| Feb 10, 1997 | 09864 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Mar 31, 2015 |
| Dec 21, 1990 | STO4W | ES-ELECTRIC SIGNS NONE | V*-DOB VIOLATION - DISMISSED | — | Mar 16, 2015 |
| Dec 20, 1990 | STO3W | ES-ELECTRIC SIGNS NONE | V*-DOB VIOLATION - DISMISSED | — | Mar 16, 2015 |