Maintenance code violations
Harlem River Houses Bldg 6, Manhattan • Block 02016 • Lot 0060
138 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Feb 12, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC SYSTEM AT EAST WALL IN THE 3rd ROOM FROM EAST ... | 4B | Mar 19, 2026 |
| Feb 12, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC SYSTEM AT CEILING IN THE 1st ROOM FROM EAST AT... | 4B | Mar 19, 2026 |
| Feb 12, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC SYSTEM AT WEST WALL IN THE 1st ROOM FROM EAST ... | 4B | Mar 19, 2026 |
| Feb 2, 2026 | C | VIOLATION DISMISSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1s... | 1C | Feb 1, 2026 |
| Feb 2, 2026 | C | VIOLATION DISMISSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | — | Feb 8, 2026 |
| Oct 20, 2025 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Nov 3, 2025 |
| Aug 13, 2025 | B | VIOLATION DISMISSED | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ... | 2A | Sep 17, 2025 |
| Aug 8, 2025 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd ... | 2A | Sep 3, 2025 |
| Aug 8, 2025 | B | VIOLATION DISMISSED | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st... | 1A | Sep 12, 2025 |
| Aug 8, 2025 | B | VIOLATION DISMISSED | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ... | 3B | Sep 12, 2025 |
| Aug 8, 2025 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd ... | 3A | Sep 3, 2025 |
| Aug 8, 2025 | B | VIOLATION DISMISSED | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ... | 3B | Sep 12, 2025 |
| Jun 13, 2025 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st ... | 1A | Jul 9, 2025 |
| May 19, 2025 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR APPROX 30 SQ FT AT ... | 5B | May 25, 2025 |
| May 19, 2025 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 5B | Aug 22, 2025 |
| May 19, 2025 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR APPROX 30 SQ FT AT ... | 5B | May 25, 2025 |
| Apr 18, 2025 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC... | 3C | May 23, 2025 |
| Apr 18, 2025 | B | NOT COMPLIED WITH | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, WEST AN... | 3C | May 23, 2025 |
| Feb 10, 2025 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST AND NORTH WALL... | 2A | Mar 17, 2025 |
| Feb 10, 2025 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KI... | 2A | Mar 17, 2025 |
| Oct 30, 2024 | C | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING FRONT ENTRANCE DOOR AT PUBLI... | — | Nov 5, 2024 |
| Sep 30, 2024 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Oct 14, 2024 |
| Sep 30, 2024 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Oct 14, 2024 |
| Sep 30, 2024 | A | VIOLATION DISMISSED | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | Jan 3, 2025 |
| Sep 20, 2024 | C | VIOLATION DISMISSED | §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRU... | — | Sep 26, 2024 |
| Sep 18, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT LOWER WINDOW SASH IN THE 2nd ROOM FROM NORTH AT WEST LO... | 2A | Oct 23, 2024 |
| Sep 17, 2024 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd ... | 2A | Oct 13, 2024 |
| Sep 17, 2024 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STO... | 2A | Oct 13, 2024 |
| Apr 15, 2024 | C | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH WINDOW IN THE 2nd ROOM FRO... | 2A | Apr 21, 2024 |
| Apr 15, 2024 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Apr 29, 2024 |
| Apr 15, 2024 | C | VIOLATION DISMISSED | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF KEY OPERATED LOCK INSTALLED ON BULKHEAD DOOR LEAD... | — | Apr 21, 2024 |
| Apr 15, 2024 | C | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH WINDOW IN THE 2nd ROOM FRO... | 2A | Apr 21, 2024 |
| Nov 16, 2023 | C | VIOLATION DISMISSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED. AT BOILER ROOM | — | Nov 22, 2023 |
| Nov 16, 2023 | C | VIOLATION DISMISSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1s... | 1A | Nov 16, 2023 |
| Nov 6, 2023 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 3B | Dec 2, 2023 |
| Nov 6, 2023 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STO... | 3B | Dec 2, 2023 |
| Oct 18, 2023 | B | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED 10 SQ OF MOLD AT CEILIN... | — | Nov 22, 2023 |
| Oct 16, 2023 | B | VIOLATION DISMISSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FRO... | 4B | Nov 20, 2023 |
| Oct 16, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN TH... | 4B | Nov 20, 2023 |
| Aug 3, 2023 | C | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH GLASS AT WEST WINDOW AT PUBLIC HALL STAI... | — | Aug 9, 2023 |
| Aug 3, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LOWER SASH GLASS AT WEST WINDOW AT PUBLIC HALL STAIRS, 1st STORY | — | Sep 7, 2023 |
| Aug 1, 2023 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL S... | — | Nov 4, 2023 |
| Aug 1, 2023 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Aug 15, 2023 |
| Aug 1, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE K... | 2B | Sep 5, 2023 |
| Aug 1, 2023 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STO... | 2B | Aug 27, 2023 |
| Aug 1, 2023 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd ... | 2B | Aug 27, 2023 |
| Aug 1, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH, SOUTH AND WE... | 2B | Sep 5, 2023 |
| Aug 1, 2023 | C | VIOLATION DISMISSED | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICA... | 2B | Aug 7, 2023 |
| Aug 1, 2023 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | 2B | Aug 15, 2023 |
| Jul 24, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN TH... | 1A | Aug 28, 2023 |