Skip to content

235 West 146 Street, Manhattan

Manhattan • Block 02032 • Lot 0010 • Zip: 10039

Condition

What the city currently has open against this building, counted from its own records.

Address

Primary address: 235 West 146 Street, Manhattan
Borough: Manhattan
Zip code: 10039
Block: 02032
Lot: 0010
BBL: 1020320010
Unified address ID: 1020320010

Land use and zoning

Land use: Multi-Family Walk-Up Buildings
Zoning: R7-2 (Residential)
Lot type: Inside
Lot area: 8,318 sq ft
Lot dimensions: 83 ft x 99 ft
Built FAR: 4.19
Max residential FAR: 3.44
Max facility FAR: 6.5
School district: 5

Building

Building class: Walk-up Apartments - Over Six Families Without Stores (C1)
Year built: 1940
Last altered: 1940
Floors: 5
Total units: 45
Residential units: 45
Building area: 34,860 sq ft
Building dimensions: 83 ft x 86 ft
Basement: Below grade full basement
Owner: ESQUIRE GROUP ESTATES LLC

Latest assessment

Assessment year: 2018/19
Tax class: Apartments
Market value: $3,462,000
Total assessment: $1,557,900
Land assessment: $99,900
Exempt total: $0
Assessment owner: ESQUIRE GROUP ESTATES

Neighborhood

The area this lot falls inside, and the commute Hoodkit measures from it.

Neighborhood Harlem
District Manhattan

Getting around

Estimated 3 days ago
Nearest station
135 St A B C

About 7 minutes on foot · 427 m

  • Times Square 27 min 7 walking, 20 riding
  • Penn Station 29 min 7 walking, 22 riding
  • Grand Central 35 min 7 walking, 28 riding
  • Union Square 40 min 7 walking, 33 riding
  • Fulton Street 41 min 7 walking, 34 riding
  • Downtown Brooklyn 46 min 7 walking, 39 riding

Around this address

Transit and places within 0.5 miles of the lot.

Activity

Sales, filings, permits and violations from every dataset, in one order.

2026

  1. HPD violation Jun 11, 2026

    Class B

    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC...

  2. HPD violation Jun 11, 2026

    Class B

    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL ...

  3. HPD violation Jun 11, 2026

    Class B

    § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5A, 2nd STORY, 2nd APARTMENT FROM EAST ...

  4. HPD violation Jun 11, 2026

    Class B

    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL ...

  5. HPD violation Jun 11, 2026

    Class B

    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL ...

  6. HPD violation Jun 11, 2026

    Class B

    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ...

2022

  1. DOB violation Aug 2, 2022

    BENCH-FAILURE TO BENCHMARK NONE

    FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

2021

  1. DOB violation Apr 29, 2021

    EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE

    FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

2016

  1. Permit issued Jun 24, 2016

    EW / OT

    ARISTON CHIMNEY LLC

  2. DOB filing Jun 24, 2016 $15,000

    Alteration Type II

    INSTALL NEW METAL CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

  3. Permit issued Mar 2, 2016

    EW / FB

    G. BAUER, INC

  4. DOB filing Mar 2, 2016 $20,000

    Alteration Type II

    REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

2015

  1. DOB filing Feb 27, 2015 $30,000

    Alteration Type II

    PROPOSED STRUCTURAL REINFORCEMENT AT SIDEWALK ENTRY VAULT, NO CHANGE TO USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION

  2. DOB filing Feb 20, 2015 $50,000

    Alteration Type II

    PROPOSED FACADE REPAIRS, NO CHANGE TO USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION

2014

  1. DOB violation May 15, 2014

    LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

2013

  1. DOB filing Nov 21, 2013 $99,000

    Alteration Type III

    PARAPET WALL REPLACEMENT AND COPING STONE REPLACEMENT, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK ...

  2. DOB violation Mar 1, 2013

    LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT

2012

  1. Permit issued Oct 26, 2012

    EW / FB

    WASOFF PLBG. & UTL.CO INC

  2. Permit issued Oct 10, 2012

    PL / PL

    WASOFF PLBG & UTILITY CO

2011

  1. DOB violation Oct 31, 2011

    C-CONSTRUCTION OTHER OPTIONAL

  2. Permit issued Jun 23, 2011

    EW / OT

    TOTAL NY CONSTRUCTION COR

  3. Permit issued Jun 23, 2011

    EQ / EQ

    TOTAL NY CONSTRUCTION COR

  4. DOB filing Jun 22, 2011 $327,340

    Alteration Type II

2008

  1. ECB violation Dec 11, 2008 $400

    CLASS - 2

    FOLLOWING THE RECEIPT OF A PERMIT TO ERECT A SIDEWALK SHED,THE PERMIT HOLDER SHALL POST A READILY VISIBLE SIGN ON THE...

  2. ECB violation Dec 11, 2008 $400

    CLASS - 2

    FAILURE TO PROVIDE/POST SIGNS AT JOB SITE. NO CONTRACTORS SIGN AT JOB SITE. REMEDY: COMPLY WITH CODE.

  3. ECB violation Oct 25, 2008 $400

    CLASS - 2

    FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. SHED LOADED WITH BRICKS,LIGH DUTY SHED NO STORAGE. REMEDY: MAINTAIN ADEQUA...

  4. ECB violation Oct 25, 2008 $1,600

    CLASS - 1

    LICENSED RIGGER FAILED TO DESIGNATE A FOREMAN 1- NO FOREMAN ON SITE REM: COMPLY WITH NOTICE OF VIOLATION

  5. ECB violation Oct 25, 2008 $400

    CLASS - 2

    FAILED TO NOTIFY DEPARTMENT/ OBTAIN PERMIT PRIOR TO USE/ INSTALLATION OFF "C" HOOKS/ OUTRIGGER BEAMS IN CONNECTION WI...

  6. ECB violation Oct 25, 2008 $2,400

    CLASS - 1

    NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD. PERFORMED BY AUTHORIZED PERSON ON SITE. 1- NO RECORD OF ANY INSP...

  7. Sale Mar 26, 2008 $2,527,257

    Changed hands

    235 WEST 146 STREET

  8. DOB violation Jan 3, 2008

    LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

2005

  1. Sale Nov 7, 2005 $0

    Changed hands

    235 WEST 146 STREET

The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.

Property Contacts

Contact information aggregated from multiple government sources

1

Registration Contracts

Contact information from multiple dwelling registrations

CorporateOwner
ESQUIRE GROUP ESTATES LLC.
1454 43RD STREET 613
Brooklyn, NY, 11219
Agent
ESQUIRE GROUP ESTATES LLC
1454 43RD STREET 613
Brooklyn, NY, 11219
HeadOfficer
LOUIS KOPLOWITZ
1454 43RD STREET 613
Brooklyn, NY, 11219
SiteManager
LOUIS KOPLOWITZ
2

Building Permits

Owner information from Department of Buildings filings

Owner
ESQUIRE GROUP ESTATES LLC
CHAIM JACOBOVITZ
Owner
ESQUIRE GROUP ESTATES
ROBERT ROSENBERG
Owner
SQUIRE GROUP ESTATES LLC.
ROBERT ROSENBERG
Owner
PETER NAKOS AS 7A ADMINISTRATOR
PETER NAKOS
Owner
NAPCO REALTY LTD
PETER NAKOS
Owner
HPD 7A ADMINISTRATOR
PETER NAKOS
Owner
BILLY CONTRACTORS
ILBER PILKU
Owner
235 W 146 ST REALTY, LLC
ILAN ZINNER
Owner
225 WEST 146 S.P. REALTY LLC
ELAN VINNER
Owner
225 W 146 ST REALTY, LLC
ILAN ZINNER
4

Deed Records

Parties from ACRIS deed and mortgage records

ASSIGNOR
C/O BMO CAPITAL MARKETS CORP 151 WEST 42ND STREET
NEW YORK, NY, 10036
ASSIGNEE
9062 OLD ANNAPOLIS ROAD
COLUMBIA, MD, 21045
MORTGAGOR/BORROWER
1274 49TH STREET, SUITE 467
BROOKLYN, NY, 11219
PARTY 1
1274 49TH STREET, SUITE 467
NEW YORK, NY, 11219
PARTY 2
C/O BMO CAPITAL MARKETS CORP
3 TIMES SQUARE
NEW YORK, NY, 10036
PARTY ONE
565 FIFTH AVENUE, 12TH FLOOR
NEW YORK, NY, 10017
PARTY TWO
PARTY TWO
PARTY 1
2329 NOSTRAND AVE
3RD FL
BROOKLYN, NY, 11210
PARTY 2
2329 NOSTRAND AVE, 3RD FLOOR
BROOKLYN, NY, 11210

Show all recorded documents

5

Property Records

Owner information from assessment and PLUTO records

Assessment Owner
PLUTO Owner