Skip to content

Maintenance code violations

13-19 Hamilton Terrace, Manhattan • Block 02050 • Lot 0100

659 records

HPD grades a violation A for non-hazardous through C for immediately hazardous.

Issued Class Status Violation Apartment Correct by
Apr 14, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE AT SINK BASE CABINET IN TH... 6I May 19, 2022
Apr 14, 2022 B VIOLATION CLOSED § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE DRAIN PIPE AT WASH BASIN IN THE BATHR... 1G May 19, 2022
Mar 28, 2022 B VIOLATION WILL BE REINSPECTED § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED... 1G May 2, 2022
Mar 28, 2022 C VIOLATION CLOSED § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR ... IN THE ENTRANCE LOCAT... 1F Apr 3, 2022
Mar 28, 2022 A VIOLATION WILL BE REINSPECTED § 27-2005 ADM CODE REFIT ... IN THE ENTRANCE LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH 1F Jul 1, 2022
Mar 28, 2022 C VIOLATION WILL BE REINSPECTED § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE E... 1F Apr 23, 2022
Mar 28, 2022 A VIOLATION WILL BE REINSPECTED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT HEAT RIS... 1F Jul 1, 2022
Mar 28, 2022 B VIOLATION WILL BE REINSPECTED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL BUZZER RETURN SYSTEM AT BUILDING FRONT DOOR TO INTERC... 1G May 2, 2022
Mar 28, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE CEMENT TILED FLOOR NEAR BTH... 1F May 2, 2022
Mar 28, 2022 B VIOLATION CLOSED § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED... 1F May 2, 2022
Mar 28, 2022 B VIOLATION WILL BE REINSPECTED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL AND ... 1J May 2, 2022
Mar 28, 2022 B VIOLATION WILL BE REINSPECTED § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN T... 1J May 2, 2022
Feb 18, 2022 B VIOLATION CLOSED § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCA... 1G Mar 25, 2022
Feb 18, 2022 C VIOLATION CLOSED § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE , IN THE ENT... 6D Mar 16, 2022
Feb 18, 2022 C VIOLATION CLOSED § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS FIRE DOOR AT PUBLIC HALL LEADING TO STAIR WA... Mar 16, 2022
Feb 18, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AND BUZZER INTERCOM SYSTEM AT NORTH WALL. IN THE FOYE... 1G Mar 25, 2022
Feb 18, 2022 C VIOLATION CLOSED § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS FIRE DOOR AT PUBLIC HALL LEADING TO STAIR WA... Mar 16, 2022
Feb 18, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AND BUZZER INTERCOM SYSTEM AT EAST WALL IN THE FOYER ... 6D Mar 25, 2022
Feb 14, 2022 C VIOLATION WILL BE REINSPECTED § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE E... 6D Mar 12, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY,... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3G, 3rd STO... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CE... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM L... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH AND NORTH ... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 3G, 3rd STORY, 4th... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT SOUTH WALL IN THE BATHROOM LOCA... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BA... 3G Feb 15, 2022
Jan 11, 2022 B VIOLATION CLOSED § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCHUTCHEN PLATE HEAT RISER AT CEILING IN THE BATHROOM LOCATED AT APT... 3G Feb 15, 2022
Dec 6, 2021 B LEAD DOCS SUBMITTED, ACCEPTABLE § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 1K Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 6J Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 5K Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 4I Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 4D Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 4C Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 2L Jan 10, 2022
Dec 6, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 2E Jan 10, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 5A Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 3K Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 3J Jan 3, 2022
Nov 29, 2021 B LEAD DOCS SUBMITTED, ACCEPTABLE § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 3I Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 3A Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 2K Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 2B Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 1A Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 1M Jan 3, 2022
Nov 29, 2021 C NOV SENT OUT § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. Dec 3, 2021
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 6G Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 6B Jan 3, 2022
Nov 29, 2021 B VIOLATION CLOSED § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... 5M Jan 3, 2022
Nov 29, 2021 B NOV SENT OUT § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... 5I Jan 3, 2022