Maintenance code violations
18-20 St Nicholas Place, Manhattan • Block 02054 • Lot 0036
618 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jan 6, 2025 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH, EAST WALLS A... | 2G | Feb 10, 2025 |
| Jan 6, 2025 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 2G | Feb 1, 2025 |
| Jan 6, 2025 | B | VIOLATION DISMISSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FRO... | 2G | Feb 10, 2025 |
| Aug 8, 2024 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR... | — | Sep 12, 2024 |
| Jun 14, 2023 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1FG, 1st ST... | 1FG | Jul 10, 2023 |
| Nov 14, 2022 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 2A | Dec 10, 2022 |
| Oct 11, 2022 | C | NOV SENT OUT | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL REC... | — | Oct 15, 2022 |
| Oct 11, 2022 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | — | Oct 15, 2022 |
| Jul 11, 2022 | C | VIOLATION DISMISSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE E... | 2E | Aug 6, 2022 |
| Jul 11, 2022 | C | INVALID CERTIFICATION | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd ... | 2E | Aug 6, 2022 |
| Jul 11, 2022 | B | NOV SENT OUT | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC... | 2E | Aug 15, 2022 |
| Jul 11, 2022 | B | NOV SENT OUT | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 2E | Aug 15, 2022 |
| Feb 15, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B... | 2D | Mar 22, 2022 |
| Feb 15, 2022 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY,... | 2D | Mar 22, 2022 |
| Feb 15, 2022 | B | NOV SENT OUT | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILI... | 2D | Mar 22, 2022 |
| Feb 15, 2022 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A... | 2D | Mar 22, 2022 |
| Feb 15, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SEALED ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCAT... | 2D | Mar 22, 2022 |
| Jul 21, 2021 | C | NOV CERTIFIED LATE | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURI... | 4C | Aug 28, 2021 |
| Jul 21, 2021 | C | NOV CERTIFIED LATE | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURI... | 2A | Aug 28, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT STEAM RISER AT TOP AT NORTH IN THE KITCHEN LOCATE... | 4C | Aug 24, 2021 |
| Jul 20, 2021 | C | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2A | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | C | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2A | Aug 27, 2021 |
| Jul 20, 2021 | C | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2A | Aug 27, 2021 |
| Jul 20, 2021 | C | VIOLATION CLOSED | § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT 2A, 2nd STORY... | 2A | Aug 15, 2021 |
| Jul 20, 2021 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 4C | Aug 15, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4B | Aug 24, 2021 |
| Jul 20, 2021 | C | VIOLATION CLOSED | § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 4C, 4th ST... | 4C | Aug 15, 2021 |
| Jul 20, 2021 | C | NOTICE OF ISSUANCE SENT TO TENANT | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd ... | 2A | Aug 15, 2021 |
| Jul 20, 2021 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 2A | Aug 15, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | A | NOV SENT OUT | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 3r... | 4C | Oct 23, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV SENT OUT | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 4F | Aug 15, 2021 |
| Jul 20, 2021 | C | NOTICE OF ISSUANCE SENT TO TENANT | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th ... | 4F | Aug 15, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4E | Aug 24, 2021 |
| Jul 20, 2021 | C | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2A | Aug 27, 2021 |
| Jul 20, 2021 | C | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2A | Aug 27, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY,... | 4F | Aug 24, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR AT EAST AND WEST BASE CABINET IN THE KITCHEN LOCATED ... | 4F | Aug 24, 2021 |
| Jul 20, 2021 | C | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2A | Aug 27, 2021 |
| Jul 20, 2021 | C | NOV CERTIFIED LATE | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4C | Aug 27, 2021 |
| Jul 20, 2021 | A | NOV SENT OUT | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE KITCHEN... | 2A | Oct 23, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT A... | 4F | Aug 24, 2021 |
| Jul 20, 2021 | A | NOV SENT OUT | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT ... | 2A | Oct 23, 2021 |
| Jul 20, 2021 | B | NOV SENT OUT | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A... | 4F | Aug 24, 2021 |