Maintenance code violations
476-482 West 165 Street, Manhattan • Block 02111 • Lot 0010
1,023 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTM... | 3B | Dec 30, 2014 |
| Nov 25, 2014 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 3B, 3rd... | 3B | Feb 28, 2015 |
| Nov 25, 2014 | C | VIOLATION DISMISSED | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT ... | 3B | Dec 3, 2014 |
| Nov 25, 2014 | C | VIOLATION DISMISSED | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN IN THE BATHROOM LOCATED AT APT 3B, 3r... | 3B | Dec 3, 2014 |
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WAL... | 3B | Dec 30, 2014 |
| Nov 25, 2014 | C | VIOLATION DISMISSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING SOUTH AND WEST WALLS I... | 3B | Dec 3, 2014 |
| Nov 25, 2014 | A | VIOLATION CLOSED | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... | 3B | Feb 28, 2015 |
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 3B, ... | 3B | Dec 30, 2014 |
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS ON NORTH AND SOUTH WALLS IN THE KITCHE... | 3B | Dec 30, 2014 |
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOODEN WALL CABINETS IN THE KITCHEN LOCATED AT APT 3B, 3r... | 3B | Dec 30, 2014 |
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WAL... | 3B | Dec 30, 2014 |
| Nov 25, 2014 | C | VIOLATION DISMISSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE KITCHEN LOCATED... | 3B | Dec 3, 2014 |
| Nov 25, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 3B... | 3B | Dec 30, 2014 |
| Oct 27, 2014 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A... | 1D | Dec 1, 2014 |
| Oct 15, 2013 | B | VIOLATION DISMISSED | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF NIGHT STAND AT PUBLIC HALL, 3rd STORY, SECTION AT SOUTH | — | Nov 19, 2013 |
| May 9, 2013 | C | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK INSTALLED ON DOOR OF PARTITION WALL ERECTED D... | 1D | May 17, 2013 |
| Apr 29, 2013 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL... | — | May 7, 2013 |
| Mar 5, 2013 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM SYSTEM LOCATED AT APT 1D, 1st STORY, 2nd APARTMEN... | 1D | Apr 9, 2013 |
| Jan 4, 2013 | B | VIOLATION DISMISSED | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE... | — | Feb 8, 2013 |
| Dec 27, 2011 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 5D | Jan 17, 2012 |
| Dec 27, 2011 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 5D | Jan 22, 2012 |
| Jun 22, 2010 | B | VIOLATION CLOSED | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE... | — | Jul 27, 2010 |
| Jun 22, 2010 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REFIT ROOF DOOR , 5th STORY, SECTION AT WEST | — | Sep 25, 2010 |
| Jun 22, 2010 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ROOF DOOR , 5th STORY, SECTION AT WEST | — | Jul 27, 2010 |
| Jun 22, 2010 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ROOF DOOR , 5th STORY, SECTION AT EAST | — | Jul 27, 2010 |
| Jun 22, 2010 | C | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCKABLE SLIDE BOLT AT ROOF DOOR , 5th STORY, SECTION AT EAST | — | Jun 28, 2010 |
| Jun 22, 2010 | B | VIOLATION CLOSED | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS EAST A... | — | Jul 27, 2010 |
| Jun 22, 2010 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT EAST COURT AND REAR YARD | — | Jul 27, 2010 |
| Jun 22, 2010 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REFIT DOOR TO EAST YARD AT PUBLIC HALL, 1st STORY | — | Sep 25, 2010 |
| Jan 26, 2009 | B | VIOLATION CLOSED | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY,... | 3J | Mar 2, 2009 |
| Jan 26, 2009 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AIR VALVE IN THE 1st ROOM FROM EAST LOCATED AT APT 3J, 3rd... | 3J | May 1, 2009 |
| Jan 26, 2009 | B | VIOLATION CLOSED | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STO... | 3J | Mar 2, 2009 |
| Jan 23, 2009 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st ... | 3C | Feb 27, 2009 |
| Jan 23, 2009 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT... | 3C | Feb 27, 2009 |
| Jan 23, 2009 | B | VIOLATION CLOSED | § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... NORTH, EAST AND SOUTH WALL IN... | 3C | Feb 27, 2009 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BA... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH AT SOUTH WINDOW IN THE 4th ROOM FROM NOR... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER LEAK AT CEILING IN THE 4th ROOM F... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR P... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROOM ENTANCE DOOR IN THE 4th ROOM FR... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH W... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st WINDOW FRAME FROM SOU... | 5G | Jan 11, 2009 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WEST WALL AND CEILING IN T... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B... | 5G | Jan 11, 2009 |
| Oct 8, 2008 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ,, 1st DOOR FRAME FROM NORTH... | 5G | Jan 11, 2009 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE APT DOOR FRAME IN THE FOYER LOCATED AT APT 5G, 5th STORY, ... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL, EAST ... | 5G | Nov 12, 2008 |
| Oct 8, 2008 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, WEST... | 5G | Nov 12, 2008 |