Skip to content

Job filings

451-463 West 165 Street, Manhattan • Block 02111 • Lot 0064

16 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Mar 5, 2020 140777719 Alteration Type II SIGNED OFF REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $24,000 BEACH LANE MANAGEMENT
Dec 10, 2019 140862485 Alteration Type II SIGNED OFF INTERIOR RENNOVATION IN APARTMENT 4A, FOURTH FL OF THE EXISTING BUILDING. NEW PARTITIONS AND PLUMBING WORK. ALL AS PE... $53,220 631 EDGECOMBE L.P.
Oct 16, 2019 140852174 Alteration Type II SIGNED OFF INTERIOR RENNOVATION IN APARTMENT 5J, FIFTH FL OF THE EXISTING BUILDING. NEW PARTITIONS AND PLUMBING WORK. ALL AS PER... $49,270 631 EDGECOMBE L.P.
Mar 12, 2019 123439172 Alteration Type II SIGNED OFF INTERIOR RENOVATION TO APARTMENT #4C ON THE 4TH FLOOR OF EXISTING BUILDING. PARTITION AND PLUMBING WORK, ALL AS PER P... $47,300 C/O BEACH LANE MANAGEMENT
Mar 6, 2019 122888296 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALLATION OF WASHERS, DRYERS AND REQUIRED SPRINKLER HEADS ON CELLAR FLOOR, FOR TENANTS USE ONLY, ACCESSORY TO BUIL... $19,500 C/O BEACH LANE MANAGEMENT
Jul 30, 2018 140779557 Alteration Type II SIGNED OFF INSTALL CHIMNEY LINER PER PLANS. $15,200 631 EDGECOMBE LP
Aug 30, 2017 122201713 Alteration Type II SIGNED OFF REPLACE EXISTING HOT & COLD WATER PIPING THROUGHOUT BUILDING. REPLACE RISERS,OVERHEAD MAIN BRANCHES IN ENTIRE BUI... $572,650 BEACH LANE MANAGEMENT
Jun 28, 2017 140598306 Alteration Type II SIGNED OFF REMOVE 3,000 ABOVE GROUND STORAGE TANK AND REPLACE WITH (2) 275 GALLON FUEL OIL TANKS. CHANGE GRADE OF FUEL OIL FROM ... $25,000 631 EDGECOMBE LP C/O BEACH LANE
Jan 13, 2016 140063268 Alteration Type III SIGNED OFF INSTALLATION OF SIDEWALK SHED AS PER PLAN. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EG... $0 CEPRINE SCAFFOLDING SERVICES
Jan 13, 2016 140063302 Alteration Type III SIGNED OFF INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EG... $0 CEPRINE SCAFFOLDING SERVICES
Dec 7, 2010 120468993 Alteration Type II SIGNED OFF MISC RENOVATIONS IN APT 5B, 5TH FLOOR. WORK TO INCLUDE NEW BATH & KITCHEN FINISHES.RELOCATE ALL PLUMBING FIXTURES... $22,250 SCHARFMAN ORGANIZATION
Dec 7, 2010 120299694 Alteration Type II SIGNED OFF LEGALIZE MISC. RENOVATIONS IN APT 6E, 6TH FLOOR. ALSO FILING FOR NEW MISC RENOVATIONS IN APT 4E, 4TH FLOOR.NO CHANGE ... $51,750 SHARFMAN ORGANIZATION
Sep 16, 2010 120322258 Alteration Type II SIGNED OFF MISC RENOVATIONS IN APT 6J, 6TH FLOOR. WORK TO INCLUDE NEW BATH & KITCHEN FINISHES.REPLACE FIXTURES ON EXISTING R... $24,050 SHARFMAN ORGANIZATION
Dec 30, 2009 110185576 Alteration Type II SIGNED OFF MISC. RENOVATION IN APARTMENT 6C, 6TH FLOOR. WORK TO INCLUDE NEW FINISHES IN KITCHEN AND BATHROOM, REPLACE PLUMBING F... $15,000 SHARFMAN ORGANIZATION
Dec 29, 2009 110412483 Alteration Type II SIGNED OFF MISC RENOVATIONS IN APARTMENTS 1J, 1ST FLOOR & 3A, 3TH FLOOR. WORK TO INCLUDE NEW BATH & KITCHEN FINISHES.NO ... $21,950 SHARFMAN ORGANIZATION
Jul 11, 2006 104239138 Alteration Type II SIGNED OFF MISC. RENOVATIONS IN APT. # 1B, FIRST FL. WORK TO INCLUDE NEW FINICHES IN KITCHEN & BATHROOM, REPLACE ALL PLUMBIN... $12,000 SCHARFMAN ORGANIZATION