Maintenance code violations
523-525 West 160 Street, Manhattan • Block 02119 • Lot 0054
18 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jan 7, 2025 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 2D | Feb 2, 2025 |
| Jan 6, 2025 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | 2D | Jan 20, 2025 |
| Dec 9, 2024 | C | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT BUILDING ENT... | — | Dec 23, 2024 |
| Dec 9, 2024 | C | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT VESTIBULE DO... | — | Dec 23, 2024 |
| Aug 1, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1B | Sep 5, 2022 |
| Aug 1, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2C | Sep 5, 2022 |
| Aug 1, 2022 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 2D | Aug 27, 2022 |
| Aug 1, 2022 | B | DEFECT LETTER ISSUED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 15 SQ FEET AT CEIL... | 2D | Sep 5, 2022 |
| Aug 1, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 2D | Nov 4, 2022 |
| Jul 22, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2B | Aug 26, 2022 |
| Jul 22, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5A | Aug 26, 2022 |
| Jul 22, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4B | Aug 26, 2022 |
| Jul 11, 2022 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | 5C | Jul 15, 2022 |
| Jul 11, 2022 | C | NOV SENT OUT | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 5C | Jul 15, 2022 |
| Jan 31, 2018 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE... | 4C | May 6, 2018 |
| Jan 31, 2018 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE... | 4C | May 6, 2018 |
| Jan 27, 2014 | C | VIOLATION DISMISSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | — | Feb 4, 2014 |
| Jan 27, 2014 | C | VIOLATION DISMISSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1s... | 1B | Jan 26, 2014 |