2110 Amsterdam Avenue, Manhattan
Manhattan • Block 02121 • Lot 0037 • Zip: 10032
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Times Square 28 min 5 walking, 23 riding
- Penn Station 32 min 5 walking, 27 riding
- Grand Central 36 min 5 walking, 31 riding
- Union Square 42 min 5 walking, 37 riding
- Fulton Street 43 min 5 walking, 38 riding
- Downtown Brooklyn 48 min 5 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
WaHi Diner
No description yet
Mike’s Bagels
No description yet
La Dinastia
No description yet
Native Noodles
Native Noodles offers a unique twist on traditional Asian cuisine, with a focus on fresh, locally sourced ingredients...
Carrot Top Pastries
No description yet
Döden
No description yet
Hilltop Park Alehouse
No description yet
La Reina del Chicharron
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Sep 9, 2025
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO EAST WALL...
-
HPD violation Sep 9, 2025
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC...
-
HPD violation Sep 9, 2025
Class B
§ 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2C, 2nd S...
-
HPD violation Jun 20, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Jun 12, 2025
Class A
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC...
-
HPD violation Jun 12, 2025
Class A
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B...
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2022
-
Alteration Type II
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER ALARM SYSTEM IN CONJUNCTION WITH NB#121205043
2021
-
CLASS - 2
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS-NO OVERHEAD PROTECTION SITE OPEN TO ...
-
CLASS - 2
WORK CONTRARY TO CONSTRUCTION DOCUMENTS-SITE SAFETY PLAN.AT THE TIME OF MY INSPECTION,I OBSERVED THAT THE CONSTRUCTIO...
2020
-
CLASS - 1
3303.11 PERMANENT STAIRS 4 STORIES/40 FT AT TIME OF INSPECTION AT A 5 STORY ALT,I OBSERVED ON A ACTIVE JOB SITE 1ST F...
-
CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR AMENDMENT-CELLAR & 1ST FL STRUCTURE/FRAMING PLANS.AT TI...
-
CLASS - 1
UNSAFE CONDITIONS & EQUIPMENT-SUSPENDED SCAFFOLD/C-HOOKS & PARAPET CLAMPS-EXPO 1.AT THE TIME OF INSPECTION AT A 5 STO...
-
CLASS - 1
28-104.2.2 FAILURE TO PROVIDE APPROVED PLANS/DOCUMENTS AT TIME OF INSPECTION.AT TIME OF INSPECTION AT A 5 STORY ALT,I...
2019
2008
-
Alteration Type II
INSTALLATION OF NEW PLUMBING SYSTEMS COMPLETE WITH NEW BATHROOMS AND KITCHENS THROUGHOUT BUILDING. INSTALLATION OF NE...
-
Alteration Type II
NEW HEATING AND VENTILATION SYSTEMS THROUGHOUT BUILDING COMPLETE WITH NEW BOILER. THIS APPLICATION IS BEING FILED IN ...
-
Alteration Type I
Rehabilitation of existing building. Plumbing, mechanical, and sprinkler will be filed as a separate filing.
2003
-
Alteration Type II
Replace roofing down to roof deck. Repair parapet wall and other roof items. No changes to uses, egress or occupancy.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records