241-247 Fort Washington Avenue, Manhattan
Manhattan • Block 02139 • Lot 0152 • Zip: 10032
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Times Square 28 min 5 walking, 23 riding
- Penn Station 32 min 5 walking, 27 riding
- Grand Central 36 min 5 walking, 31 riding
- Union Square 42 min 5 walking, 37 riding
- Fulton Street 43 min 5 walking, 38 riding
- Downtown Brooklyn 48 min 5 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Malecon
No description yet
El Floridita
No description yet
WaHi Diner
No description yet
Mike’s Bagels
No description yet
El Mercadito Mexicano
No description yet
La Dinastia
No description yet
Native Noodles
Native Noodles offers a unique twist on traditional Asian cuisine, with a focus on fresh, locally sourced ingredients...
Flor De Mayo Washington Heights
Flor De Mayo Washington Heights is a vibrant and eclectic restaurant serving up delicious Chinese and Peruvian cuisin...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Aug 3, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHE...
-
HPD violation Aug 3, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE PRIVATE H...
-
HPD violation Jun 11, 2026
Class C
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT...
-
HPD violation Jun 11, 2026
Class B
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st...
-
HPD violation Jun 11, 2026
Class A
§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A C...
-
HPD violation Jun 11, 2026
Class B
§ 27-2005 HMC: REFIT THE FIRE DOOR LEADING TO THE NORTH SECTION AT PUBLIC HALL, 1st STORY
2024
-
Alteration Type II
Demolition and installation of interior non-bearing partitions. Plumbing fixtures as per plans. No change in occupanc...
-
CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA...
2023
-
Alteration Type II
NEW DRY WALL PARTITIONS ONE NEW POWDER ROOM ONE NEW BATHROOM WITH A SHOWER AND A RENOVATED KITCHEN ALL FIXTURES TO BE...
2022
-
CLASS - 1
REGISTERED DESIGN PROFESSIONAL FAILED TO IMMEDIATELY NOTIFY THE DEPARTMENT OF UNSAFE CONDITIONS AS MANDATED BY RULE 1...
-
Alteration Type I
HEREWITH FILING FOR ACCESSORY OFFICES FOR MEDICAL FACILITIES IN RESIDENTIAL BUILDING.
-
CLASS - 3
28-301-1 FAILURE TO POST BLDG EXTERIOR WALL CONDITION CERT AS REQUIREDAS PER 1RCNY103-04 ATOI CERT WAS NOT POSTED IN ...
-
DOB violation Feb 17, 2022
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
-
DOB violation Feb 17, 2022
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
2018
-
Alteration Type II
PATCHING OF CRACKED AND SPALLED TERRA COTTA MASONRY, PATCHING OF STONE MASONRY AS PER PLANS FILED.
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
-
DOB violation May 31, 2018
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
-
CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPUR...
2017
2016
-
DOB violation Nov 14, 2016
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2015
-
DOB violation Dec 14, 2015
E-ELEVATOR ELEVATORREQUIRED
2012
-
CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING WEST ELEVATION,EXPOSURE #3 OBSERVE BROKEN & DEFECTIVE FIRE ESCAPE THREAD ON THE...
2004
-
Alteration Type II
INSTALLATION OF ANTENNAS ON ROOF ALL WORK CONFORMANCE WITH TPPN/9 8_NO CHANGE IN USE EGRESS OR OCCUPANCY
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records