1251-1257 St Nicholas Avenue, Manhattan
Manhattan • Block 02141 • Lot 0042 • Zip: 10032
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 28 min 5 walking, 23 riding
- Penn Station 32 min 5 walking, 27 riding
- Grand Central 36 min 5 walking, 31 riding
- Union Square 42 min 5 walking, 37 riding
- Fulton Street 43 min 5 walking, 38 riding
- Downtown Brooklyn 48 min 5 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Malecon
No description yet
El Floridita
No description yet
WaHi Diner
No description yet
Mike’s Bagels
No description yet
Guac Time
No description yet
El Mercadito Mexicano
No description yet
La Dinastia
No description yet
Native Noodles
Native Noodles offers a unique twist on traditional Asian cuisine, with a focus on fresh, locally sourced ingredients...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 1
FAILURE TO MAINTAIN USE OF PROHIBITED USE OF DOORS AND HARDWARE AT CELLAR FIRE PASSAGEWAY. DOORS AND ASSOCIATED HARDW...
-
CLASS - 1
FAILURE TO MAINTAIN UNOBSTRUCTED FIRE PASSAGEWAY AT CELLAR LEVEL. AT TIME OF INSPECTION, OBSERVED GARBAGE, HOUSEHOLD ...
-
CLASS - 1
FAILURE TO MAINTAIN CONCRETE CEILING WITHIN CELLAR FIRE PASSAGEWAY. AT TIME OF INSPECTION, OBSERVED CEILING IN DISREP...
-
DOB violation Jun 9, 2026
C-CONSTRUCTION OTHER OPTIONAL
REQUEST FOR STRUCTURAL STABILITY REPORT FOR CELLAR FIRE PASSAGEWAY CEILING. OBSERVED CONCRETE CEILING IN DISREPAIR WI...
-
HPD violation Jun 4, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN L...
-
CLASS - 2
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED AT APARTMENT 3E FULL HEIGHT PARTITION WALL ERECTED IN BEDROOM W...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. A TIME OF INSPECTION OBSERVED AT EXPOSURE#3 FIRE ESCAPE PATHWA...
-
HPD violation Apr 27, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT ...
-
HPD violation Apr 27, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE KITCHEN ...
-
HPD violation Apr 27, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALACE AT 1ST WINDOW FROM ...
-
HPD violation Apr 27, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHRO...
-
HPD violation Apr 27, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR. IN THE 3rd ROO...
2025
-
CLASS - 1
CLASS 1(RTS):FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-9...
2023
2019
-
Alteration Type II
INSTALLING NEW COOKING EQUIPMENT AND HOOD/DUCT EXHAUST SYSTEM IN EXISTING DELI/GROCERY STORE. NO OTHER WORK TO BE DON...
-
DOB violation May 3, 2019
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017
-
Alteration Type II
INTERIOR RENOVATIONS AS PER PLANS FILED TO RESOLVE VIOLATIONS.
-
DOB violation Jan 3, 2017
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
-
DOB violation Dec 16, 2016
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Nov 14, 2016
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
-
DOB violation Jun 1, 2016
E-ELEVATOR ELEVATORREQUIRED
2012
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED OF 85 LF AS PER PLANS. SHED IS DESIGNED FOR A LIVE LOAD OF 300 PSF. ALL WORK...
-
Alteration Type III
REMOVE CORNICE AND RE-BUILT PARAPET WALL AS PER PLAN, NO CHANGE USE AND EGRESS & OCCUPANCY.
2011
-
Alteration Type II
REMOVE GAS METERS FROM EACH APARTMENT AND ADD NEW GAS REPIPING THROUGHOUT THE BUILDING. NO CHANGE IN OCCUPANCY, EGRES...
2006
2001
-
Alteration Type II
REPLACE OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records