508-510 West 180 Street, Manhattan
Manhattan • Block 02152 • Lot 0041 • Zip: 10033
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 28 min 5 walking, 23 riding
- Penn Station 32 min 5 walking, 27 riding
- Grand Central 36 min 5 walking, 31 riding
- Union Square 42 min 5 walking, 37 riding
- Fulton Street 43 min 5 walking, 38 riding
- Downtown Brooklyn 48 min 5 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Malecon
No description yet
El Floridita
No description yet
Guac Time
No description yet
El Mercadito Mexicano
No description yet
La Dinastia
No description yet
Flor De Mayo Washington Heights
Flor De Mayo Washington Heights is a vibrant and eclectic restaurant serving up delicious Chinese and Peruvian cuisin...
Flor De Mayo
Flor De Mayo is a popular Chinese-Peruvian restaurant in Washington Heights. Known for its delicious fusion cuisine, ...
Burger Heights
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Apr 14, 2026
Class B
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ...
-
HPD violation Apr 14, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCAT...
-
HPD violation Apr 14, 2026
Class C
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH AT EAST WALL AT PUB...
-
HPD violation Apr 14, 2026
Class C
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FR...
-
HPD violation Mar 25, 2026
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT NORTH WALL...
2025
-
HPD violation Dec 2, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2023
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Apr 25, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2022
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP #1 OF 5 STORY OCCUPIED MULTIPLE DWELLING (1) F...
-
DOB violation Mar 24, 2022
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP #1 OF 5 STORY OCCUPIED MULTIPLE DWELLING (1) F...
2021
-
DOB violation Oct 20, 2021
P-PLUMBING NONE
FAILURE TO PROVIDE APPROVED / ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION I OBSERVED AT TIME OF SPOT CHECK INSPE...
-
CLASS - 1
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39032505P ISSUED11/24/20&TO FILE C/C PURSUANT TO28-201...
-
CLASS - 1
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39032505P ISSUED11/24/20&TO FILE C/C PURSUANT TO28-201...
-
CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39032505P ISSUED ON 11/24/2020 AND TO ...
-
CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39032505P ISSUED ON 11/24/20 AND TO FI...
-
DOB violation Feb 17, 2021
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO#39032505P ISSUED ON 11/24/2020 AND TO FILE A C...
2016
2012
-
Alteration Type III
COURNICE REMOVAL AND SPOT POINTING AS PER PLAN, NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
-
Alteration Type III
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER ...
2011
-
Alteration Type III
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCC...
2005
-
Alteration Type II
REPLACE BOILER AND OIL BURNER AND CHANGE FIRE DEPT RECORDS FROM #4 TO #2 OIL. NO CHANGE IN EGRESS, OCCUPANCY OR USE U...
2003
-
Alteration Type II
Repave rear yard and inner court yards as shown on plans provided. No changes to uses, egress or occupancy.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records