Job filings
510-514 West 188 Street, Manhattan • Block 02159 • Lot 0012
4 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| May 24, 2013 | 120439622 | Alteration Type III | SIGNED OFF | INSTALLATION OF 115 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... | $0 | PERIMETER BRIDGE & SCAFFOLD |
| May 17, 2013 | 120350235 | Alteration Type II | SIGNED OFF | REHABILATION OF APARTMENTS AND REPLACEMENT OF PLUMBING FIXTURES AT EXISTING LOCATIONS AND RISERS. NEW GAS METERS AT C... | $1,183,280 | 83 POST AVENUE ASSOCIATES LLC |
| Aug 29, 2012 | 120479892 | Alteration Type II | SIGNED OFF | REPLACE BOILER AND OIL BURNER (NYC BOILER NO: MD26553-01) AND CHANGE GRADE OF OIL FROM #4 TO #2. | $0 | 83 POST AVENUE ASSOC. LLC |
| Nov 5, 2003 | 103340403 | Alteration Type II | SIGNED OFF | REPLACE 4000 GALLON FUEL OIL TANK WITH 3,500 GALLON ABOVEGROUND FUEL OI L TANK NO CHANGE IN EGRESS OCCUPANCY OR USE U... | $19,400 | 83 POST AVENUE ASS |