DOB violations
4181-4189 Broadway, Manhattan • Block 02176 • Lot 0074
35 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Mar 26, 2025 | SR11204MA | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | EMERGENCY WORK ORER.IT WAS OBSERVED @ EXP 1 (S.ELEV) CRACKS ON PARAPET STUCCO, CRACKED DECORATIVE STONES, CRACKS ON B... | — |
| Jun 30, 2023 | 01285 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 03671 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 03670 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 02540 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 00139 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 00140 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 01284 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 02539 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 02462 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 04804 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 04686 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01425 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01431 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00274 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00282 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 29, 2021 | 2001579 | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 | Jun 8, 2021 |
| Sep 2, 2020 | 01470 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | May 26, 2021 |
| Jan 17, 2020 | 00410 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Jun 14, 2021 |
| Jun 23, 2017 | 00092 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Feb 6, 2019 |
| Dec 19, 2016 | 9027/586003 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 17, 2017 |
| Mar 3, 2015 | 00646 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Oct 6, 2017 |
| Nov 25, 2013 | 9027/493589 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jan 9, 2015 |
| Apr 10, 2012 | 9027/429381 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 26, 2012 |
| Feb 16, 2011 | 9028/372368 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Nov 29, 2012 |
| Apr 20, 2010 | 9027/334769 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | May 17, 2010 |
| Jul 2, 2008 | 9011/253988 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 31, 2008 |
| Oct 27, 2006 | 9011/180113 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Aug 7, 2007 |
| Oct 1, 2005 | 02231 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jul 26, 2007 |
| Feb 28, 2005 | 90111121936 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 12, 2007 |
| Apr 17, 2003 | 9011/170974 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | 1P10322 | Aug 11, 2005 |
| Jan 8, 2002 | 9013/146149 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | 1P10322 | Jun 12, 2002 |
| Apr 29, 1991 | 1420C06 | E-ELEVATOR ELEVATORREQUIRED | VP-VIOLATION UNSERVED ECB-ACTIVE | DEVICE #1P10322 | — |
| Oct 17, 1990 | 1300C1 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | PROVIDE ACCESS TO MACHINE ROOM ANDOVERHEAD -RENEW HOIST CABLES | Mar 16, 1992 |
| Sep 26, 1988 | 1289C/4 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | (51)PROPERTY TAG GOVERN AFTER CONDUCTING 2 YEAR TEST (50)PROVIDE ACCESS TO MOTOR ROOM | Jan 12, 1989 |