DOB violations
116 Hudson View Gardens, Manhattan • Block 02179 • Lot 0170
132 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 23, 2024 | 00532 | EARCX-FAILURE TO SUBMIT EER NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | — |
| Apr 22, 2023 | 00626 | EARCX-FAILURE TO SUBMIT EER NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) | — |
| Dec 15, 2022 | 00067 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Apr 2, 2026 |
| Dec 15, 2022 | 00057 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Dec 15, 2022 | 00064 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Jul 22, 2026 |
| Dec 15, 2022 | 00063 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Jul 22, 2026 |
| Dec 15, 2022 | 00058 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Dec 15, 2022 | 00065 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Apr 2, 2026 |
| Dec 15, 2022 | 00059 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Jul 22, 2026 |
| Dec 15, 2022 | 00062 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Apr 1, 2026 |
| Dec 15, 2022 | 00066 | RWNRF-RETAINING WALL NONE | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | Apr 2, 2026 |
| Dec 15, 2022 | 00061 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Dec 15, 2022 | 00060 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Aug 21, 2022 | 00298 | EARCX-FAILURE TO SUBMIT EER NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) | — |
| Jun 20, 2021 | 10199 | EARCX-FAILURE TO SUBMIT EER NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020 | — |
| Oct 1, 2019 | 00096 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Oct 1, 2019 | 00097 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Oct 1, 2019 | 00085 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Dec 27, 2018 | 9028/641846 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Feb 20, 2019 |
| Dec 29, 2017 | 9028/619640 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 30, 2018 |
| Dec 29, 2017 | 9028/619641 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 30, 2018 |
| Dec 20, 2017 | 9028/618997 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 30, 2018 |
| Dec 20, 2017 | 9028/618999 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 30, 2018 |
| Dec 20, 2017 | 9028/618998 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 30, 2018 |
| Feb 24, 2017 | 00134 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Feb 27, 2018 |
| Feb 24, 2017 | 00132 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Feb 27, 2018 |
| Feb 24, 2017 | 00133 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Feb 27, 2018 |
| Feb 17, 2017 | HAZ86636 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 12, 2021 |
| Feb 17, 2017 | HAZ86634 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 12, 2021 |
| Feb 17, 2017 | HAZ86635 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 12, 2021 |
| Feb 17, 2017 | HAZ86616 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Nov 30, 2017 |
| Feb 17, 2017 | HAZ86617 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Nov 30, 2017 |
| Feb 17, 2017 | HAZ86618 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 12, 2021 |
| Feb 17, 2017 | HAZ86633 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 12, 2021 |
| Feb 17, 2017 | HAZ86615 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 25, 2017 |
| Dec 19, 2016 | 9027/592406 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Dec 16, 2016 | 9027/592497 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Feb 27, 2017 |
| Dec 16, 2016 | 9027/592496 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Feb 27, 2017 |
| Nov 14, 2016 | 08156 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Dec 2, 2016 |
| Nov 14, 2016 | 08159 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Dec 2, 2016 |
| Nov 14, 2016 | 08157 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Dec 2, 2016 |
| Nov 14, 2016 | 08158 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Dec 2, 2016 |
| Nov 14, 2016 | 08154 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Dec 2, 2016 |
| Nov 14, 2016 | 08155 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Dec 2, 2016 |
| Oct 1, 2015 | 00078 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Mar 4, 2025 |
| Dec 2, 2014 | 9028/527671 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jun 1, 2015 |
| Dec 2, 2014 | 9028/527672 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Feb 6, 2015 |
| Nov 29, 2014 | 9028/523616 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jun 1, 2015 |
| May 30, 2014 | 04407 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST | Oct 1, 2019 |
| Dec 4, 2013 | 9027/492914 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jan 20, 2015 |