Skip to content

Job filings

Fort Washington Avenue, Manhattan • Block 02180 • Lot 0001

25 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Jun 25, 2024 110366988 Alteration Type I SIGNED OFF $10,532,000 COLLEGIATE CHURCH CORP.
Feb 16, 2024 110371561 Alteration Type III SIGNED OFF BUILDERS PAVEMENT PLAN $0 COLLEGIATE CHURCH CORP.
Jan 6, 2023 123076786 Alteration Type II SIGNED OFF INSTALLATION OF WINDOWS AND FACADE WORK. SHED TO BE FILED AS A SEPARATE APPLICATION AS SHOWN ON DRAWINGS FILED HEREWI... $1,835,100 THE MINISTER,ELDERS AND DEACONS
Apr 14, 2022 140976317 Alteration Type III SIGNED OFF INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 SPRING SCAFFOLDING LLC
Jul 27, 2021 140681322 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 SPRING SCAFFOLDING LLC
Jan 15, 2021 140680403 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 SPRING SCAFFOLDING LLC
Mar 23, 2017 110371570 Alteration Type II SIGNED OFF INSTALLATION OF NEW TEMPORAL 3 INTERIOR FIRE ALARM SYSTEM W/AUTOMATIC SMOKE/ HEAT /CO DETECTION/SPRINKLER & PURGE... $61,000 COLLEGIATE CHURCH CORP.
Jun 29, 2016 122450007 Place of Assembly COMPLETED $0 COLLEGIATE CHURCH CORP
Jun 29, 2016 122441358 Place of Assembly COMPLETED $0 COLLEGIATE CHURCH CORP
Jun 29, 2016 122441367 Place of Assembly COMPLETED $0 COLLEGIATE CHURCH CORP
Mar 24, 2016 110428289 Alteration Type II SIGNED OFF INSTALL (1) 2500 GALLON OIL TANK. NO CHANGE IN EGRESS USE OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION. $35,000 FT WASHINGTON COLLEGIATE CHURCH
Mar 22, 2016 140084236 Alteration Type III SIGNED OFF INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. $0 REPUBLIC SCAFFOLD&HOIST CORP
Mar 22, 2016 140084254 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY... $0 REPUBLIC SCAFFOLD&HOIST CORP
Feb 26, 2016 122623795 Alteration Type III PLAN EXAM - APPROVED FIRE PROTECTION PLAN $1,000 COLLEGIATE CHURCH CORP.
Feb 2, 2016 102734276 Alteration Type II SIGNED OFF REPLACE OIL FIRED BOILER WEITH OIL FIRED BOILER BY WEIL MCLAN #838, 2,0 0,000 BTU'S, MEA #76-85-E. NO CHANGE TO USE E... $12,000 COLLEGIATE CHURCH CORP.
Dec 14, 2015 122173897 Alteration Type II SIGNED OFF INSTALL FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $3,000 FORT WASHINGTON COLLEGIATE CHURC
Apr 22, 2015 102510542 Alteration Type III SIGNED OFF Erect 150' of Heavy Duty Sidewalk Shed 300 psf during minor roof repairs. Shed shall comply with LL 33/91 No change i... $0 Ft. Washington Colligate Church
Dec 4, 2012 121160251 Alteration Type II SIGNED OFF RENOVATION OF EXISTING ACCESSORY OFFICES IN AN EXISTING PLACE OF WORSHIP ON THE CELLAR. ARCHITECTURAL WORK. NO CHANGE... $35,000 COLLEGIATE CHURCH CORP.
Aug 16, 2011 120439114 Alteration Type III SIGNED OFF INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANG... $0 OUTDOOR INSTALLATIONS, LLC
Jul 15, 2011 120430701 Alteration Type III SIGNED OFF INSTALLATION OF 84 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERNATION, FILED SEPARATELY. LIVE LOAD 300 PS... $0 OUTDOOR INSTALLATIONS, LLC
Nov 20, 2009 110253289 Place of Assembly PLAN EXAM - DISAPPROVED $0 COLLEGIATE CHURCH
Nov 20, 2009 110253190 Place of Assembly PLAN EXAM - DISAPPROVED $0 COLLEGIATE CHURCH
Nov 20, 2009 110253154 Place of Assembly PLAN EXAM - DISAPPROVED $0 COLLEGIATE CHURCH
Dec 13, 2001 102480968 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK Installation of a new 4 ton condensing unit, air handling unit and related ductw ork. No change in use egress or occu... $20,000 Ft. Washington Collegiate Church
Apr 17, 2001 102914278 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK partition & plumbing modifications as shown on plans. no change in use, egress or occupancy $63,000 ft. washington collegiate church