DOB violations
Marble Hill Houses, Manhattan • Block 02215 • Lot 0116
100 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| May 13, 2025 | SR20809MA | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | EMERGENCY WORK ORDER DUE TO; SPALLED/SPALLING BRICKWORK, DAMAGED/ SPALLING MORTAR JOINTS, AND CRACKED BRICKWORK AT EX... | — |
| May 13, 2025 | SR20801MA | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER: AT THE TIME OF INSPECTION IT WAS OBSERVED THROUGHOUT BUILDIN... | — |
| Jun 23, 2024 | 00929 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | Oct 28, 2024 |
| May 24, 2023 | 911145 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | NYCHA CYCLE 9A UNSAFE REPORT FILED | — |
| Apr 22, 2023 | 00182 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) | May 12, 2023 |
| Nov 23, 2022 | 910577 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | NYCHA CYCLE 9A UNSAFE REPORT FILED | — |
| Aug 21, 2022 | 00794 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) | May 12, 2023 |
| Aug 19, 2022 | 00596 | FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | NYCHA CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | — |
| Feb 22, 2022 | 00764 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Dec 20, 2022 |
| Feb 22, 2022 | 00763 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Feb 22, 2022 | 00762 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Dec 20, 2022 |
| Feb 22, 2022 | 00761 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Dec 20, 2022 |
| Feb 22, 2022 | 00759 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Feb 22, 2022 | 00760 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Dec 19, 2022 |
| Jun 20, 2021 | 00416 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) | Aug 6, 2021 |
| Jun 29, 2020 | 00318 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) | Aug 6, 2021 |
| Sep 5, 2018 | HAZ87615 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Sep 5, 2018 | HAZ87612 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Sep 5, 2018 | HAZ87616 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Sep 5, 2018 | HAZ87613 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Jul 10, 2018 | HAZ87532 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Jul 10, 2018 | HAZ87531 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jun 22, 2021 |
| May 31, 2018 | 20273 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Jul 31, 2018 |
| May 31, 2018 | 20274 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Jul 31, 2018 |
| May 31, 2018 | 20299 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Oct 2, 2018 |
| May 31, 2018 | 20300 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Oct 2, 2018 |
| May 31, 2018 | 20301 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Oct 2, 2018 |
| May 31, 2018 | 20302 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Oct 2, 2018 |
| Apr 6, 2018 | 11777 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Mar 11, 2019 |
| Mar 27, 2018 | 00178 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017) | Apr 3, 2018 |
| Jan 26, 2018 | 00157 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Apr 11, 2018 |
| Jan 26, 2018 | 00155 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Apr 11, 2018 |
| Feb 16, 2017 | 10493 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016) | Feb 16, 2017 |
| Jan 3, 2017 | 00153 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Jan 3, 2017 | 00154 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Jan 3, 2017 | 00155 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Jan 3, 2017 | 00577 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Jan 3, 2017 | 00578 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 2, 2017 |
| Jan 3, 2017 | 00588 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 7, 2017 |
| Jan 3, 2017 | 00590 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 7, 2017 |
| Jan 3, 2017 | 00599 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Jan 3, 2017 | 00600 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Jan 3, 2017 | 01207 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 20, 2017 |
| Jan 3, 2017 | 01208 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 20, 2017 |
| Jan 3, 2017 | 00589 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 7, 2017 |
| Jan 3, 2017 | 00152 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Feb 28, 2017 |
| Mar 14, 2016 | 00225 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2015 | Mar 28, 2016 |
| May 15, 2014 | 21218 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Mar 11, 2019 |
| Mar 1, 2013 | 25118 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Feb 10, 2015 |
| Jan 31, 2013 | 20039 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Sep 10, 2014 |