927 Courtlandt Avenue, Bronx
Bronx • Block 02409 • Lot 0096 • Zip: 10451
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Grand Central 43 min 13 walking, 30 riding
- Times Square 45 min 13 walking, 32 riding
- Penn Station 46 min 13 walking, 33 riding
- Union Square 47 min 13 walking, 34 riding
- Fulton Street 53 min 13 walking, 40 riding
- Downtown Brooklyn 62 min 13 walking, 49 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Citi Bike
Places nearby
Hibachi Grill and Supreme Buffet
No description yet
Minato By Porto Salvo
No description yet
Xochimilco Family Restaurant
No description yet
Starbucks
Starbucks at 260 E 161st St in Bronx, NY offers a cozy and welcoming atmosphere to enjoy your favorite coffee beverag...
Delicioso Coco Helado
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 13, 2026
Class A
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FRO...
-
HPD violation May 22, 2026
Class B
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES , IN THE ENTIRE APARTMENT...
-
HPD violation May 22, 2026
Class A
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES 1ST WALL LIGHT FIXTURE FR...
-
HPD violation May 22, 2026
Class A
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT JOINTS AT TILED WALL AT EAST I...
-
HPD violation May 14, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation May 14, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER GLASS PANE AT ENTRANCE DOOR FROM VESTIBULE TO...
2022
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A AND 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTE...
-
DOB violation Feb 22, 2022
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2020
-
CLASS - 2
CLASS 2 ITEMS, A) EXPIRED BRAKE TAG REMEDY; PROVIDE UP TO DATE TAG B)DIRTY CAR TOP REMEDY; CLEAN C ) CERTIFICATE FRAM...
2019
-
CLASS - 2
99-BB-07, 57-BB-07, 59-BB-07, 02-X-10, 64-M-07, 56-M-07, 70-O-02.(4)99-BB PROVIDE UP TO DATE TAG TEAM FROM TEST. (2) ...
-
DOB violation Apr 29, 2019
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Apr 29, 2019
E-ELEVATOR ELEVATORREQUIRED
2018
-
DOB violation Apr 21, 2018
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Apr 21, 2018
E-ELEVATOR ELEVATORREQUIRED
2016
-
DOB violation Jun 24, 2016
E-ELEVATOR ELEVATORREQUIRED
2013
-
New Building
HEREWITH FILING STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH THE CONSTRUCTION OF A NEW 9 STORY RESIDENTIAL BUIL...
-
Alteration Type III
HEREWITH FILING BUILDER'S PAVEMENT PLAN IN CONJUNCTION WITH CONSTRUCTION OF NEW TWELVE-STORY RESIDENTIAL BUILDING FIL...
-
Alteration Type III
INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WI...
-
Alteration Type III
INSTALLATION OF MULTIPOINT SCAFFOLDING AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SCAFFOLD S...
-
Alteration Type II
HEREWITH FILING INSTALLATION OF NEW FIRE ALARM SYSTEM IN CONJUNCTION WITH A NEW TWELVE(12) STORY BUILDING FILED UNDER...
-
Alteration Type II
HEREWITH FILING SPRINKLER AND STANPIPE WORK IN CONJUNCTION WITH A NEW TWELVE(12) STORY BUILDING FILED UNDER D.O.B APP...
2012
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS: UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTION S...
-
CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS: "PARTIAL SWO" ON ALL EXTERIOR WO...
-
CLASS - 1
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING: PER SECTION REQUIREMENTS. UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTION ...
2009
2008
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records