1139 Clay Avenue, Bronx
Bronx • Block 02429 • Lot 0024 • Zip: 10456
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 34 min 10 walking, 24 riding
- Times Square 36 min 10 walking, 26 riding
- Union Square 38 min 10 walking, 28 riding
- Penn Station 39 min 10 walking, 29 riding
- Fulton Street 44 min 10 walking, 34 riding
- Downtown Brooklyn 52 min 10 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jun 15, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WAL...
-
HPD violation Jun 15, 2026
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND ALL WALLS IN TH...
-
HPD violation Jun 15, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation May 29, 2026
Class A
§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A C...
-
HPD violation May 12, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Mar 30, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
2021
-
DOB violation Aug 4, 2021
C-CONSTRUCTION OTHER OPTIONAL
DUE TO ILLEGAL DEMOLITION AT ADJACENT PROPERTY 1135 CLAY AVENUE A PARTIAL VACATE ORDER ISSUED FOR EXPOSURE #2 SIDE YA...
2017
-
DOB violation Jan 25, 2017
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016
-
CLASS - 1
SEC. 408.2 MISC VIOLATION DRIPS-FAILURE CONNECTS EXITS DOWN STREAM OF APPLIANCE. OBSERVED ON 10/27/16 FUTURE GAS CONN...
2014
2011
-
DOB violation Dec 13, 2011
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2008
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2006
2005
-
Alteration Type II
Application filed to remove blocked up existing door opening & install new doors in Apt. 24 & 25 & also c...
-
Hazardous
WORK WITHOUT A PERMIT WORK NOTED: (1) IN APARTMENT # 2425 AT THE NORTH& SOUTH EAST ELEVATION OF BUILDING THE BEDROOM ...
-
Hazardous
EXIT PASSAGEWAY TOTAL OBSTRUCTION AT THE 5TH FLOOR APARTMENT # 24 AND 25 AT FRONT OF BUILDING EAST SIDE FIRE ESCAPED ...
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1994
-
DOB violation Jun 9, 1994
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records