Job filings
102 1/2 East 165 Street, Bronx • Block 02471 • Lot 0015
6 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Oct 28, 2016 | 240150395 | Alteration Type III | SIGNED OFF | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE.... | $0 | RK CONSTRUCTION INC |
| Oct 26, 2016 | 240144358 | Alteration Type III | SIGNED OFF | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33... | $0 | RK CONSTRUCTION INC |
| Jun 13, 2016 | 240144991 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | FACADE REPAIR, REPLACE WINDOW LINTELS AND POINTING AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPA... | $7,200 | RK CONTRACTING INC |
| Oct 11, 2007 | 200743473 | Alteration Type II | SIGNED OFF | REMOVE EXISITNG 5000 GALLON F.O. STORAGE TANK AND REPLACE IN SAME LOCATION NEW 5000 GALLON F.O. STORAGE TANK IN EXIST... | $15,000 | WEST WALTON REALTY CORP. |
| Apr 13, 2004 | 200668125 | Alteration Type II | SIGNED OFF | REPLACE BOILER AND OIL BURNER. NO CHANGE TO USE EGRESS OR OCCUPANCY | $0 | WEST WALTON AVE |
| Jun 11, 2001 | 200667796 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Upgrade exist. fire suppression system, as shown on plan. No change in use, occupany, or egress. | $2,000 | N/A |