Maintenance code violations
1264-1272 Gerard Avenue, Bronx • Block 02481 • Lot 0001
1,106 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Sep 15, 2021 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th ... | 4N | Oct 11, 2021 |
| Sep 15, 2021 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STO... | 4N | Oct 11, 2021 |
| Sep 15, 2021 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 4N | Oct 11, 2021 |
| Sep 15, 2021 | C | VIOLATION CLOSED | § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 4N, 4th S... | 4N | Oct 11, 2021 |
| Sep 15, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER ESCUTCHEON PLATE AT THE FIRST RISER FROM NORTH AT EAST IN THE B... | 4N | Oct 20, 2021 |
| Sep 15, 2021 | A | VIOLATION CLOSED | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC TILES AT NORTH IN THE BATHROOM ... | 4N | Dec 19, 2021 |
| Sep 15, 2021 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STO... | 4L | Oct 11, 2021 |
| Sep 15, 2021 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 4L | Oct 11, 2021 |
| Sep 15, 2021 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED... | 4L | Oct 20, 2021 |
| Sep 15, 2021 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STOR... | 4L | Oct 20, 2021 |
| Sep 15, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER ESCUTCHEON PLATE AT FIRST RISER FROM EAST AT SOUTH IN THE BATHR... | 4L | Oct 20, 2021 |
| Sep 15, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER ESCUTCHEON PLATE AT SECOND RISER FROM EAST AT SOUTH IN THE BATH... | 4L | Oct 20, 2021 |
| Sep 14, 2021 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 4L | Oct 22, 2021 |
| Sep 14, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 4W | Oct 19, 2021 |
| Sep 14, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN TH... | 4N | Oct 19, 2021 |
| Sep 14, 2021 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LO... | 4N | Oct 19, 2021 |
| Sep 14, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 4N | Oct 19, 2021 |
| Sep 14, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, SOUT... | 4L | Oct 19, 2021 |
| Sep 14, 2021 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE KITCH... | 4L | Dec 18, 2021 |
| Sep 14, 2021 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL, ... | 4L | Dec 18, 2021 |
| Sep 13, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' | — | Oct 18, 2021 |
| Sep 13, 2021 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT ... | — | Dec 17, 2021 |
| Sep 13, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING ... | — | Oct 18, 2021 |
| Sep 13, 2021 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6N, 6th STORY,... | 6N | Oct 18, 2021 |
| Sep 13, 2021 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A... | 6N | Oct 18, 2021 |
| Sep 13, 2021 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILING, WALLS, DOORS, A... | 6N | Dec 17, 2021 |
| Sep 13, 2021 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE K... | 6N | Oct 18, 2021 |
| Sep 13, 2021 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, WEST, S... | 6N | Oct 18, 2021 |
| Sep 10, 2021 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | — | Sep 14, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6W | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6M | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6K | Oct 15, 2021 |
| Sep 10, 2021 | B | LEAD DOCS SUBMITTED, ACCEPTABLE | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6C | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6A | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 5R | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 5S | Oct 15, 2021 |
| Sep 10, 2021 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5T | Oct 15, 2021 |
| Sep 10, 2021 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4T | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4L | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4J | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3N | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3K | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3H | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3G | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3D | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3A | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1G | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 2U | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 2L | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 2G | Oct 15, 2021 |