181 Bruckner Boulevard, Bronx
Bronx • Block 02565 • Lot 0008 • Zip: 10454
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 29 min 7 walking, 22 riding
- Union Square 33 min 7 walking, 26 riding
- Times Square 36 min 7 walking, 29 riding
- Fulton Street 39 min 7 walking, 32 riding
- Penn Station 43 min 7 walking, 36 riding
- Downtown Brooklyn 47 min 7 walking, 40 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
The Bronx Brewery
No description yet
Llame Ya Taqueria & Jugeria
No description yet
Jalisco Tacos
Mexican
Milk Burger
Milk Burger is a trendy restaurant in the Bronx known for their juicy burgers and milkshakes. With a modern industria...
Pio Pio
Pio Pio is a vibrant Peruvian restaurant in the Bronx known for its delicious rotisserie chicken and traditional dish...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2024
2021
2020
-
DOB violation Mar 16, 2020
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2019
-
Alteration Type II
INSTALLATION UNDER GENERAL CONSTRUCTION - OT FOR PAINT SPRAY BOOTH & PREP STATION. MS-MECHANICAL FILED UNDER DOB ...
2018
-
Alteration Type II
INSTALLATION & ASSEMBLY OF PAINT SPRAY BOOTH, WITH EXTENSION OF EXISTING SPRINKLER SYSTEM WITH ADDED HEADS IN BOO...
2017
-
DOB violation Dec 9, 2017
P-PLUMBING NONE
THE DOB INTENDS TO REVOKE ALL FIRE SUPPRESSION APPROVALS AND PERMITS UNDER JOB #220532127 DUE TO SUSPENSION OF LICENS...
-
Alteration Type II
REPLACE EXISTING GAS WATER HEATER WITH NEW 15 H.P. GAS FIRED HIGH PRESSURE BOILER IN THE PLACE OF EXISTING GAS WATER ...
2016
-
DOB violation Dec 16, 2016
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
2009
-
Alteration Type II
DIRECT REPLACEMENT OF ROOFTOP HVAC UNIT ON EXISTING DUNNAGE. NO CHANGE TO BULK, USE, EGRESS OR OCCUPANCY.
2008
-
Alteration Type II
CONSTRUCT NEW PAINT SPRAY BOOTH AND PAINT MIXING ROOM. RELATED MECHANICAL AND SPRINKLER WORK. NO CHANGE IN USE, EGRES...
-
Non-Hazardous
WORKING W/O A PERMIT.UPON INSPECTION ON AUTO BODY SHOP UNDER CONSTRUCTION,NEWLY INSTALLING SHEET,( ) & ELECTRICAL WOR...
2005
-
Alteration Type II
CONSTRUCT PAINT STORAGE ROOM AND INSTALL HEATED PAINT SPRAY BOOTH ON 1ST FLOOR OF DISPLAY ADDRESS. NO CHANGE TO ZONIN...
-
DOB violation Sep 29, 2005
C-CONSTRUCTION OTHER OPTIONAL
2004
-
Non-Hazardous
FAILURE TO PROVIDE ALL REQUIRED INFORMATION TO DEMONSTRATE COMPLIANCE WITH ALL APPLIANCE LAWS FOR RELATED APPLICATION...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records