Skip to content

Job filings

Boston Road, Bronx • Block 02614 • Lot 0038

18 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Jun 14, 2017 220150841 New Building SIGNED OFF SUBSEQUENT APPLICAITON FOR SUPPORT OF EXCAVATION (SOE) AS PER PLANS FILED HEREWITH. $0 COMMON GROUND COMMUNITY II HDFC
Jun 7, 2017 220210732 Alteration Type III SIGNED OFF FILING HEREWITH A BUILDERS PAVEMENT PLAN FOR CONSTRUCTION OF 82.52 LINEAR FEET OF SIDEWALK, CURB AND ROADWAY AS PER P... $0 COMMON GROUND COMMUNITY II HDFC
Aug 2, 2016 220366422 Alteration Type III SIGNED OFF INSTALLATION OF NEW PIPE SCAFFOLDING AS PER PLAN, NO CHANGE IN USE OCCUPANCY OR EGRESS $0 COMMON GROUND
Jun 29, 2016 220306522 Alteration Type II SIGNED OFF INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH ONE-WAY VOICE COMMUNICATION SYS... $100,000 COMMON GROUND COMMUNITY II HDFC
Jun 29, 2016 220210858 Alteration Type II SIGNED OFF INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. $60,000 COMMON GROUND COMMUNITY II HDFC
Jun 10, 2016 220450795 Place of Assembly COMPLETED $0 COMMON GROUND COMMUNIT
Mar 18, 2016 240096668 Alteration Type III SIGNED OFF FIRE PROTECTION PLAN IN CONJUNCTION WITH NB 220150841. $1,000 BROOK AVENUE HDFC
Feb 22, 2016 240045054 Alteration Type II SIGNED OFF FILING HERE WITH TEMPORARY STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING #220120841 $50,000 COMMON GROUND COMMUNITY II HFDC
Jan 13, 2016 220428286 Alteration Type II SIGNED OFF FILING HEREWITH APPLICATION FOR INSTALLATION OF 3 BOILERS ON ROOF, PLUMBING WORK PERFORMED UNDER NEW BUILDING APPLICA... $30,000 COMMON GROUND COMMUNITY II HDFC
Aug 20, 2015 220360277 Alteration Type III SIGNED OFF INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANG... $0 COMMON GROUND
Aug 4, 2015 240037713 Alteration Type III SIGNED OFF INSTALLATION OF 232 FEET OF HEAVY SHED FOR BUILDING ALT FILED SEPARATELY. SHED TO BE INSTALLED ON ROADWAY DOT PERMIT ... $0 COMMON GROUND
Jun 9, 2015 220348906 Alteration Type III SIGNED OFF INSTALLATION OF A SINGLE 6000 PERSONNEL/MATERIAL HOIST DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. HOIST SHAL... $0 COMMON GROUND
May 18, 2015 240095151 Alteration Type II PLAN EXAM - DISAPPROVED INSTALLATION OF EMERGENCY GENERATOR IN CONJUNCTION WITH NB #220150841 $20,000 COMMON GROUND COMMUNITY II HDFC
Oct 2, 2013 240037349 Alteration Type III PLAN EXAM - IN PROCESS INSTALLATION OF 216 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... $0 COMMON GROUND
Oct 2, 2013 240037358 Alteration Type III PLAN EXAM - IN PROCESS INSTALLATION OF 216 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... $0 COMMON GROUND
Mar 3, 2009 210075620 Demolition SIGNED OFF DEMOLITION OF STRUCTURE $0 NEW COVENANT FAITH& MIRACLE AREN
Feb 27, 2009 210080222 New Building PLAN EXAM - DISAPPROVED PROPOSED TO ERECT 8 STORIES STEEL FRAME BUILDING. $0 NEW CONVENANT FAITH & MIRACLE A.
Oct 18, 2005 200695578 Alteration Type II SIGNED OFF LAUNDROMAT ESTABLISHMENT with WASHER, DRYER, H.W.BOILER& NEW STORE FRONT NO CHANGE OF EGRESS,USE OR OCCUPANCY $73,000 El Ray Inc