ECB violations
1051-1059 Whitlock Avenue, Bronx • Block 02756 • Lot 0090
28 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Aug 8, 2026 | 39557696Z | ACTIVE | CLASS - 2 | AT THE TIME OF MY INSPECTION OF A 14 STORY NB APPROXIMATELY 22712 SQUARE FEET, I OBSERVED CLOSED SITE WITH NO CONSTRU... | $2,500 | $2,500 | Oct 16, 2026 |
| Aug 1, 2026 | 39557388R | ACTIVE | CLASS - 2 | OBS. ACTIVE CONSTR. OPS. FOR HVAC WORK AT MULT. FLRS. CONTR. TO STIPULATIONS OF AHV PERMIT NO. X00992202-I1-GC. WORKE... | $1,250 | $1,250 | Oct 16, 2026 |
| Jul 6, 2026 | 39556240X | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION, DURING HIGH WIND CONDITIONS, OBSERVED PROPOSED 14-STORY BUILDING WITH HORIZONTAL SAFETY NETTIN... | $2,500 | $2,500 | Sep 18, 2026 |
| Jul 6, 2026 | 39556241H | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION, 14-STORY BUILDING OBSERVED WITH MISSING DEBRIS NETTING BETWEEN THE PERIMETER FENCE AND SIDEWAL... | $2,500 | $2,500 | Sep 18, 2026 |
| Jul 6, 2026 | 39556239Z | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION, OBSERVED PROPOSED 14-STORY BUILDING WHERE MATERIAL STORAGE WAS LOCATED AT EXPOSURE 4 WITHOUT R... | $2,500 | $2,500 | Sep 18, 2026 |
| Jun 11, 2026 | 39555407Y | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION OF A PROPOSED 13-STORY NEW BUILDING, I OBSERVED NO WATCH PERSON ON SITE OR IN THE AREA OF T... | $2,500 | $2,500 | Aug 21, 2026 |
| Apr 22, 2026 | 39553329Z | RESOLVE | CLASS - 2 | OBSERVED 14 NB ON SUPER STRUCTURE PHASE @ 7TH FL WORKING DECK. ADJACENT PROPERTY @ EXPO 3 WITH INADEQUATE ADJACENT PR... | $5,030 | $5,030 | Jul 17, 2026 |
| Feb 22, 2026 | 39550731N | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION OF A PROPOSED 14-STORY NEW BUILDING, I OBSERVED NO WATCH PERSON ON SITE OR IN THE AREA OF T... | $2,500 | $0 | Jul 28, 2026 |
| Jan 30, 2026 | 39549694P | RESOLVE | CLASS - 2 | OBSERVED CONSTRUCTION FENCE INSTALLED AROUND PERIMETER OF JOBSITE AT EXPOSURE 1 &4. THE CONSTRUCTION FENCE DOES NOT H... | $1,000 | $0 | Apr 17, 2026 |
| Jan 30, 2026 | 39549692L | RESOLVE | CLASS - 1 | OBSERVED ACTIVE JOBSITE IN SOE/FOUNDATION OPERATIONS. GUARDRAIL SYSTEM INSTALLED AROUND PERIMETER OF SOE @ EXPOSURE 1... | $5,000 | $5,000 | Oct 2, 2026 |
| Dec 11, 2025 | 39547884R | RESOLVE | CLASS - 1 | A PROPOSED 14 STORY NB ACTIVE SITE AT SOE / FOUNDATION PHASE. UPON REVIEW OF CS LOGS. CS NOT PRESENT. NO CS LOGS WAS ... | $10,000 | $10,000 | Sep 21, 2026 |
| Dec 10, 2025 | 39547904P | RESOLVE | CLASS - 2 | PROPOSED 14-STORY NB ACTIVE SITE. OBSERVED A YELLOW METAL FDNY FLAMMABLE LIQUID STORAGE BOX CONTAINING DIESEL FUEL LE... | $1,250 | $1,250 | Sep 21, 2026 |
| Dec 10, 2025 | 39547905R | RESOLVE | CLASS - 1 | AT A PROPOSED 14-STORY NB SITE IN THE SOE/FOUNDATION PHASE, WORK WAS OBSERVED PROCEEDING AT THE ADJACENT PROPERTY. AT... | $5,000 | $5,000 | Sep 21, 2026 |
| Dec 10, 2025 | 39547903N | RESOLVE | CLASS - 2 | 14 STORY NB SITE CURRENTLY IN THE SOE/FOUNDATION PHASE,OBSERVED TO BE PROCEEDING CONTRARY TO THE APPROVED SUPPORT OF ... | $0 | $0 | Feb 20, 2026 |
| Oct 20, 2025 | 39546151P | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF 14-STORY NEW BUILDING,ACTIVE SITE AT EXCAVATION I OBSERVED DRILLING OPERATION INSIDE TO SITE... | $2,500 | $2,500 | Nov 23, 2026 |
| Oct 20, 2025 | 39546154K | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF INSPECTION OF A 14-STORY NEW BUILDING, ACTIVE SITE I OBSERVED CONCRETE WALL WITH CON EDISON ... | $2,500 | $2,500 | Nov 23, 2026 |
| Oct 20, 2025 | 39546153Z | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A 14-STORY NEW BUILDING, ACTIVE SITE AT EXCAVATION UPON REQUESTING SITE SAFETY MANGER ONSITE... | $2,500 | $2,500 | Nov 23, 2026 |
| Oct 20, 2025 | 39546152R | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF A 14-STORY NEW BUILDING, ACTIVE SITE EXCAVATION PHASE WITH DRILLING OPERATION AND AIR POLLUT... | $2,500 | $2,500 | Nov 23, 2026 |
| Oct 20, 2025 | 39546150N | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A 14-STORY NEW BUILDING, ACTIVE SITE AT EXCAVATION PHASE UPON REVIEWING THE APPROVE SSP PLAN... | $2,500 | $2,500 | Nov 23, 2026 |
| May 16, 2025 | 39540328Y | RESOLVE | CLASS - 2 | OBSERVED AT EXP4 SWING FENCE ENTERING INTO PUBLIC SIDEWALK HAZARD TO PEDESTRIANS CREATED STRIKE BY CONSTRUCTION EQUIP... | $0 | $0 | Aug 1, 2025 |
| Mar 6, 2023 | 39513796L | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION DEMOLITION JOB SITE I OBSERVED CONSTRUCTION FENCE HAS PERMIT EXPIRED ON : 08/20/2022 UNDER ... | $0 | $0 | May 19, 2023 |
| May 5, 2022 | 35642444N | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN CONSTRUCTION FENCE.AT TIME OF MY INSPECTION ON A DEMOLITION SIGN-OFF SITE.OBSERVED THAT THE CONST... | $0 | $0 | Jul 29, 2022 |
| May 21, 2021 | 35558061Y | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE AT TIME OF INSPECTION AT EXP#1&2 MULTIPLE CRACKS & MISSING MO... | $500 | $0 | Aug 6, 2021 |
| Apr 6, 2021 | 35556001N | RESOLVE | CLASS - 1 | FAAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF MY INSPECTION I OBSERVED AT EXP#1&2 MULTIPLE CR... | $500 | $0 | Aug 6, 2021 |
| Feb 8, 2021 | 35546150H | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTE: AT EXP.#1 & 2 OBSERVED MULTIPLE CRACKS & MISSING MORTAR FROM ... | $1,563 | $0 | Apr 30, 2021 |
| Nov 25, 2020 | 39032535X | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN. AT TIME OF INSPECTION AT EXPOSURE #1 OBSERVED STEP CRACKS, MISSING MORTAR JOINTS AND LOOSE STUCC... | $1,250 | $0 | Jan 15, 2021 |
| Nov 13, 2019 | 37015821J | RESOLVE | CLASS - 2 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35305023H ISSUED ON 01-31-19 & TO FILE A C OF C PURSUAN... | $0 | $0 | Jan 17, 2020 |
| Jan 31, 2019 | 35305023H | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER.AT TIME OF INSPECTION THE VIOLATING CONDITIONS ARE AS FOLLOWS 1... | $0 | $0 | Mar 29, 2019 |