Spofford Avenue, Bronx
Bronx • Block 02763 • Lot 0360 • Zip: 10474
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 7 days ago- Grand Central 46 min 18 walking, 28 riding
- Union Square 50 min 18 walking, 32 riding
- Times Square 53 min 18 walking, 35 riding
- Fulton Street 56 min 18 walking, 38 riding
- Penn Station 60 min 18 walking, 42 riding
- Downtown Brooklyn 64 min 18 walking, 46 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
Alteration Type II
EXISTING FACTORY (USE GROUP 17) TO BE USED AS COMMERCIAL BAKERY (FOOD PRODUCTS PROCESSING - USE GROUP 17). INSTALL NE...
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
2015
-
Alteration Type I
APPLICATION BEING FILED TO ACQUIRE FINAL CERTIFICATE OF OCCUPANCY FOR EXISTING BUILDING. CHANGE USE AND OCCUPANCY. AB...
2014
2012
-
Alteration Type II
INSTALL STEAM BOILER AND BOILER ENCLOSURE, RELOCATE HOT WATER BOILER TO NEW ENCLOSURE, INSTALL ADDITIONAL LAUNDRY EQU...
2010
2003
-
Alteration Type II
APPLICATION BEING FILED TO ADD THREE NEW TOILETS, REPAIR EXISTING ROOF, MASONRY WALL, NEW GARAGE DOOR AND NEW CEILING...
-
Alteration Type II
APPLICATION BEING FILED TO RENOVATE EXISTING OFFICE SPACE, AND INSTALL COMMERCIAL WASHERS AND DRYERS. NO CHANGE IN US...
2002
-
Alteration Type II
APPLICATION BEING FILED TO ALTER EXISTING OFFICE SPACE, NEW TOILETS AND NEW HVAC UNIT. NO CHANGE IN USE, OCCUPANCY OR...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records