Skip to content

DOB violations

1361-1363 Randall Avenue, Bronx • Block 02766 • Lot 0276

24 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Jun 30, 2023 03881 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 03880 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 02749 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 02748 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 00355 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01510 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01509 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 00356 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 02798 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 00347 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 00348 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 01557 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 01558 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 02799 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 03941 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 03942 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 00441 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 01593 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 01592 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 00442 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Mar 16, 2020 00472 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 00505 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 00504 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 00471 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION