157-161 East 176 Street, Bronx
Bronx • Block 02801 • Lot 0001 • Zip: 10457
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Times Square 39 min 5 walking, 34 riding
- Grand Central 41 min 5 walking, 36 riding
- Penn Station 42 min 5 walking, 37 riding
- Union Square 45 min 5 walking, 40 riding
- Fulton Street 51 min 5 walking, 46 riding
- Downtown Brooklyn 56 min 5 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Aug 11, 2026
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MOLD LESS THAN 10SQ FEET AT SOUT...
-
HPD violation Jul 15, 2026
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FRO...
-
HPD violation Jul 15, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B...
-
HPD violation Jul 15, 2026
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC...
-
HPD violation Jul 15, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VYNIL FLOOR TILES IN THE KITCHEN LOC...
-
HPD violation Jul 15, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1...
2023
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2020
-
DOB violation Feb 19, 2020
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019
-
CLASS - 1
CEASE USE= 05-A-10,40-P-16,37-P-16=CEASE USE ITEM CAR DOOR RESTRUCTOR ALTERED REPAIR AND CONTATC NYC DOB FOR RESTORE ...
-
DOB violation Sep 16, 2019
E-ELEVATOR ELEVATORREQUIRED
-
Alteration Type III
INSTALLATION OF EQUIPMENT CABINET ON THE ROOF. INSTALLATION OF RRUS ON THE ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/9...
-
Alteration Type II
ENLARGE EXISTING COMMUNITY FACILITY AREA ON CELLAR FLOOR OF EXISTING MIXED-USE BUILDING. NO CHANGE IN USE, EGRESS OR ...
2018
-
CLASS - 1
CU-42X10,56Y13,57M07,68B07,68B07,59B07,99B07,98B07,53M07,37O02,16F10, 100X10,25M07. 42X10-CEASE USE. DOOR POSITION MO...
-
DOB violation Jan 26, 2018
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
-
CLASS - 2
37B07,37S10-37B)OVERHEAD DOOR MUST BE SELF-CLOSING AND SELF LOCKING. 37S)OVERHEAD CEILING.
-
DOB violation Jan 3, 2017
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
-
DOB violation Nov 14, 2016
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2015
-
CLASS - 1
BC903.2.10.6 FAILURE TO PROVIDE SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED:2 OR MORE GAS DRYERS.INSPECTION TIME 31...
2014
2013
-
CLASS - 2
37D06,37T07,37X,98U15,41D06,60Q03,05E10,61I10. 37-REPAIR DOOR LOCK ANDLABEL DOOR; 37X10-WORK LIGHT REBULB AND OR REPA...
2010
-
Alteration Type II
Complete renovation of apt's F,G,H & I at 6th floor to repair fire damage. Minor repair at same lines at floors 2...
2008
-
Alteration Type III
INSTALLING TELECOMMUNICATIONS CABINETS WITH RELATED DUNNAGE AND ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN #5/98. NO C...
2005
-
Non-Hazardous
07L10/16E10/25D06/36B07/38O02/39O02/56Y13/60D06/69J07/71Q06/83O02. 07-REPAIR DOOR OPENING BUTTON.16-ADJUST LOBBY DOOR...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records