Maintenance code violations
1975 Creston Avenue, Bronx • Block 02807 • Lot 0027
56 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jul 10, 2026 | C | NOT COMPLIED WITH | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Jul 24, 2026 |
| Jul 9, 2026 | A | NOV CERTIFIED ON TIME | § 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWA... | — | Oct 12, 2026 |
| Jul 9, 2026 | A | NOV CERTIFIED ON TIME | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | Oct 12, 2026 |
| Jun 30, 2026 | B | VIOLATION CLOSED | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE... | — | Aug 4, 2026 |
| May 26, 2026 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HANDLE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1s... | — | Jun 30, 2026 |
| Jun 5, 2025 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Sep 8, 2025 |
| Apr 16, 2025 | B | VIOLATION DISMISSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL, CEILING IN THE ... | 5F | May 21, 2025 |
| Apr 16, 2025 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 5F | Jul 20, 2025 |
| Apr 16, 2025 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 2B | Jul 20, 2025 |
| Apr 16, 2025 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, CEI... | 5F | May 21, 2025 |
| — | I | VIOLATION DISMISSED | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27... | — | — |
| Jul 5, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4B | Aug 9, 2022 |
| Jul 5, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5H | Aug 9, 2022 |
| Jul 5, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5F | Aug 9, 2022 |
| Jul 5, 2022 | C | NOTICE OF ISSUANCE SENT TO TENANT | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th ... | 5F | Jul 31, 2022 |
| Jul 5, 2022 | C | NOV CERTIFIED LATE | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STO... | 5F | Jul 31, 2022 |
| Jul 5, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5D | Aug 9, 2022 |
| Jul 5, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4G | Aug 9, 2022 |
| Jun 16, 2022 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK .. CEILING IN THE KITCHEN LOCA... | 3C | Jul 21, 2022 |
| Jun 16, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 3C | Sep 19, 2022 |
| Jun 16, 2022 | C | NOTICE OF ISSUANCE SENT TO TENANT | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STO... | 2B | Jul 12, 2022 |
| Jun 16, 2022 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK .. CEILING IN THE BATHROOM LOC... | 3C | Jul 21, 2022 |
| Jun 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1G | Jul 8, 2022 |
| Jun 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1B | Jul 8, 2022 |
| Jun 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2B | Jul 8, 2022 |
| Jun 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2E | Jul 8, 2022 |
| Jun 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2H | Jul 8, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5G | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3H | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3G | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3E | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3D | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3B | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2G | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2F | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1H | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1E | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1D | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1A | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4D | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4F | Jun 7, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5C | Jun 7, 2022 |
| Apr 27, 2022 | C | VIOLATION CLOSED | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | 2A | May 1, 2022 |
| Apr 27, 2022 | C | VIOLATION CLOSED | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 2A | May 1, 2022 |
| Dec 21, 2021 | C | NOV CERTIFIED LATE | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FRO... | 2A | Jan 16, 2022 |
| Dec 21, 2021 | C | NOV CERTIFIED LATE | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM N... | 2A | Jan 16, 2022 |
| Jul 6, 2021 | C | NOV CERTIFIED LATE | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th ... | 4A | Aug 1, 2021 |
| Jul 6, 2021 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL... | 4A | Oct 9, 2021 |
| Jul 6, 2021 | A | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC... | 4A | Oct 9, 2021 |
| Jul 6, 2021 | C | NOV CERTIFIED LATE | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STO... | 4A | Aug 1, 2021 |